Of the 8 options below, council decides 4 and 4 are shared with the Province. See them at a glance
This page is a menu of options, not a plan. It walks through the choices the new council faces on recycling, the landfill's gas, climate money and targets, green building, home retrofits, tree planting and parkland. For each one it gives the strongest evidence for and against, what it cost where it was tried, and the London-scale math, shown in full or plainly marked as not derivable. It recommends nothing.
One structural fact shapes this file. Much of it is no longer council's alone. Producers have run residential recycling under provincial rules since January 1, 2026. Since June 2, 2026 provincial law has barred cities from requiring green building standards beyond the Building Code. On February 1, 2027 the Upper Thames River Conservation Authority merges into a new regional authority. Council still sets the budgets for parks, trees, garbage, the Green Bin and climate work.
Research was completed November 4, 2026, and updated on November 13, 2026 for the federal budget. Every claim links to a source, and figures we worked out ourselves are marked as derived. The council that takes office November 15, 2026 decides these questions, starting with the 2027 budget update.
READ EVERY NUMBER HERE WITH THIS
On the 2026 tax levy, $192,000 a year costs the average home $0.84, so each $1 million a year is about $4.40 for the average home (derived from the City's budget). Every dollar figure below can be read against that.
The options at a glance
Each option gets the same three things: its name, who decides it, and one London number. They're listed in the order the research found them, not ranked.
Apartment buildings are different. City staff say provincial policy makes building owners responsible for their Green Bin service, and the City ended its apartment pilot in 2026.
The honest numbers
Where London stands, every figure linked to its source.
The 10-year capital plan for 2024 to 2033 holds $271.1 million for parks and recreation and $142.9 million for environmental services. 2026 Annual Budget Update, p. 91 (PDF) ↗
Under strong-mayor rules the Mayor tables the budget each year and may veto council's amendments, and council can override a veto with a two-thirds vote. 2026 Annual Budget Update, p. 23 (PDF) ↗
The Province says the new boards will be appointed by single-tier and upper-tier municipalities in proportion to population, possibly with a cap on members per municipality, and that local watershed councils will advise them. Ontario backgrounder on conservation authorities, March 10, 2026 (PDF) ↗
GARBAGE, RECYCLING AND COMPOSTING, TOTAL COST BY YEAR: TO SCALE
2024$48.3M
2025$51.0M
2026$38.4M
2027$39.1M
The 2024 to 2027 budget as amended in 2026. The budget book does not explain the 2026 drop. It came the year producers took over residential recycling. 2026 Annual Budget Update, p. 80 (PDF) ↗
The 2026 budget also ended the City's Green Bin cart pilot for apartment buildings, saving $450,000 a year. Staff say provincial policy makes building owners responsible for that service. 2026 Annual Budget Update, p. 30 (PDF) ↗
A condition of the Province's approval requires the City to re-evaluate using the gas, with a peer-reviewed report, by April 25, 2028, and every four years after until a use is in place. Ontario.ca, Notice of Approval for W12A, O.C. 566/2024 ↗
YEARLY CONTRIBUTION TO THE CLIMATE CHANGE RESERVE FUND: TO SCALE
Set Feb 2024$1,000,000
From the 2025 budget update$192,000
Set in February 2024, then cut in November 2024 to pay for parks maintenance staff. A November 2025 motion to end it failed. 2026 Annual Budget Update, p. 231 (PDF) ↗
BOTH TRUE AT ONCE
41%
drop in London's emissions per person since 2005, to 6.5 tonnes in 2024, the lowest on record
1%
drop in London's total emissions since 2019, as the population grew and Ontario's power used more gas
In 2024 London's emissions were 3.03 million tonnes CO2e, 22% below 2005 and 1% below 2019. Per person they were 6.5 tonnes, 41% below 2005. The City's own operations were 51% below 2007, and fleet was the one category above its baseline, at 14% over. 2024 Climate Emergency Action Plan Progress Report (PDF) ↗
In a May 15, 2026 letter, the Ministry of Municipal Affairs and Housing told London that standards beyond the Building Code must be wholly voluntary and cannot be a condition of any planning approval or building permit. Green Development Framework staff report, PEC June 22, 2026 (PDF) ↗
On July 21, 2026 council received a voluntary Green Development Framework, 15 to 0, and paid for its $127,200 study from the climate reserve, 14 to 1. Staff list possible incentives such as development charge rebates, grants, faster approvals and extra density, which would need a community improvement plan and a funding source. Council minutes, July 21, 2026 (PDF) ↗Green Development Framework staff report, PEC June 22, 2026 (PDF) ↗
City planting rose from about 1,900 trees a year to more than 5,000. From 2017 to 2021 the City planted 36,000 trees against a 27,000 target, and planting on private land reached an estimated 30,000 against 44,000. Urban Forest Strategy Monitoring Report, Part 2, PEC Dec 2024 (PDF) ↗
The last stretch of the West London Dyke, from the Forks to Cavendish Park, is being rebuilt under a $13.68 million contract, to finish in fall 2027 with restoration in spring 2028. Ottawa's Disaster Mitigation and Adaptation Fund pays $5.17 million, the Province $4.25 million and the City $4.50 million. UTRCA and City flood protection projects report, ICSC Mar 23, 2026 (PDF) ↗
In September 2024 the Upper Thames authority presented a draft Thames floodplain that would add 406 buildings and 145 hectares, 213 of the buildings in the Beaufort, Irwin, Gunn and Saunby area. City staff questioned its flood flows, its 0.3 m climate allowance and its data, which end in 2010. UTRCA service review and draft floodplain report, PEC Dec 3, 2024 (PDF) ↗
Heat
Environment Canada issues heat warnings on its criteria, such as two days at 31°C or more with nights of 20°C or more, and the health unit relays them. During warnings the City points people to community centres and the Central Library, at regular hours. Middlesex-London Health Unit, Extreme heat ↗City of London, Cooling centres ↗
In July 2026 council asked for a report by the first quarter of 2027 on an air-conditioning pilot for low-income seniors, 13 to 2. Council minutes, July 21, 2026 (PDF) ↗
Smoke
Environment Canada's hourly readings for London show 49 hours at 10+, the top of the air quality scale, from July 15 to 18, 2026, and high-risk hours on 5 days in 2025 (derived, our count of the federal data). Environment Canada AQHI hourly data for Ontario (CSV files) ↗
For 2028 to 2042 the update calls for 2 more multi-use community centres, 4 neighbourhood centres, 4 ice pads, 2 indoor pools inside multi-use centres, 4 spray pads and 35 playgrounds. It adds no outdoor pools and says some outdoor and wading pools may be removed over time. Parks and Recreation Master Plan 2026 Update staff report, CPSC Sept 8, 2026 (PDF) ↗
Ottawa's Budget 2026, tabled November 5, 2026, proposes $1.5 billion over nine years through the Build Communities Strong Fund to build, expand, retrofit and repair community recreation facilities and ice rinks across Canada. Half, $750 million, is for ice rinks, and $750 million is for other community recreation facilities. The budget describes it as money for building work. The budget's table shows $680 million of it by 2030-31, so $820 million comes after that (derived). The budget does not say how to apply, what share Ottawa would pay or how much one project could get. A budget measure is a proposal until Parliament passes it. Budget 2026, chapter 4 (Nov. 5, 2026) ↗
The same budget names the Northwest London Multi-Use Community Centre on a list of projects across the country that it proposes to support through the Build Communities Strong Fund. It gives no dollar amount, cost share or date for the project, and does not say whether the money would come from the new recreation funding. Budget 2026, chapter 3 (Nov. 5, 2026) ↗
The City's 2023 asset plan puts the 10-year gap to keep today's service at $72.4 million for recreation facilities and $65.7 million for parks. 2023 Corporate Asset Management Plan (PDF) ↗
Names below are in alphabetical order. All are councillors except Mayor Morgan. The minutes record how members voted, not why. Budget Committee minutes, Nov 21, 2024 ↗
Climate reserve
On November 21, 2024 the Budget Committee voted 9 to 6 to pay for added parks maintenance by cutting the climate reserve contribution. For were Cuddy, Hillier, Lehman, Lewis, Mayor Morgan, Pribil, Rahman, Stevenson and Van Meerbergen. Against were Ferreira, Franke, Hopkins, McAlister, Peloza and Trosow. Budget Committee minutes, Nov 21, 2024 ↗
On November 20, 2025 a motion to end the contribution failed 4 to 11. For were Hillier, Rahman, Stevenson and Van Meerbergen. Against were Cuddy, Ferreira, Franke, Hopkins, Lehman, Lewis, McAlister, Mayor Morgan, Peloza, Pribil and Trosow. Budget Committee minutes, Nov 20, 2025 ↗
Green building and retrofits
On June 3, 2025 council voted 8 to 6 to refer the green development framework back until the Province decided on Bill 17. For were Cuddy, Hillier, Lehman, Lewis, Mayor Morgan, Pribil, Rahman and Stevenson. Against were Ferreira, Franke, Hopkins, McAlister, Peloza and Trosow. Van Meerbergen was absent. Council minutes, June 3, 2025 ↗
On July 22, 2025 council approved the BetterHomes loan program 12 to 3. For were Cuddy, Ferreira, Franke, Hillier, Hopkins, Lewis, McAlister, Mayor Morgan, Peloza, Pribil, Rahman and Trosow. Against were Lehman, Stevenson and Van Meerbergen. A motion to have staff report back on a concierge model, to help residents use existing federal, provincial and utility retrofit loans, and to have the Mayor ask Ottawa for long-term climate funding without municipal cost-sharing, failed 4 to 11. Hillier, Lehman, Stevenson and Van Meerbergen voted for it. Council minutes, July 22, 2025 ↗
Recycling
On November 20, 2025 the Budget Committee voted 13 to 2 to stop City recycling pickup at non-eligible locations, with Ferreira and Trosow against. On November 25 council voted 8 to 7 to ask the Province to make non-profits, places of worship and small businesses eligible. For were Ferreira, Franke, Hopkins, Lehman, McAlister, Peloza, Trosow and Van Meerbergen. Against were Cuddy, Hillier, Lewis, Mayor Morgan, Pribil, Rahman and Stevenson. Council minutes, Nov 25, 2025 (PDF) ↗Budget Committee minutes, Nov 20, 2025 ↗
Conservation authority
On December 16, 2025 a motion asking the Province to keep local, municipally governed conservation authorities failed 4 to 8. For were Ferreira, Franke, Rahman and Trosow. Against were Cuddy, Hillier, Lehman, Lewis, Mayor Morgan, Pribil, Stevenson and Van Meerbergen. Hopkins, McAlister and Peloza were absent. Council minutes, Dec 16, 2025 ↗
Rental cooling
On October 14, 2025 a by-law requiring landlords who supply air conditioning to keep units at 26°C or below from June 16 to August 31 failed 7 to 8. For were Ferreira, Franke, Hopkins, McAlister, Peloza, Rahman and Trosow. Against were Cuddy, Hillier, Lehman, Lewis, Mayor Morgan, Pribil, Stevenson and Van Meerbergen. Council minutes, Oct 14, 2025 (PDF) ↗
Natural areas
On February 8, 2024 the Budget Committee voted 8 to 7 to fund half of a natural areas management case, $144,500 in 2026 and $148,000 in 2027. For were Ferreira, Franke, Hopkins, McAlister, Peloza, Pribil, Rahman and Trosow. Against were Cuddy, Hillier, Lehman, Lewis, Mayor Morgan, Stevenson and Van Meerbergen. Budget Committee minutes, Feb 8, 2024 ↗
What cities try for this. Evidence for, evidence against, costs, and who decides, for every option, identically. The site does not pick one. That's council's job, and yours to weigh in on.
OPTION 1 OF 8
Recycling for small businesses, non-profits and places of worship
Producers now collect recycling only from eligible sources such as homes, apartments and schools. Council ended City pickup at 535 small businesses, non-profits, daycares and places of worship in 2026, and in April 2026 directed staff to set up a drop-off pilot ending December 31, 2027. The choices are a City service with a fee, pickup paid from taxes, or private haulers.
□ SHARED: CITY + PROVINCE■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
For a City service: staff wrote that one coordinated route system would cost less per stop than separate private contracts, that private competition is thin, and that locations that can't pay will stop recycling. 2026 Annual Budget Update, p. 238 (PDF) ↗
In November 2025 council asked the Province, 8 to 7, to add non-profits, places of worship and small businesses to the eligible sources. Council minutes, Nov 25, 2025 (PDF) ↗
EVIDENCE AGAINST / LIMITS
Against a City service: it is not a provincial requirement, and these locations produce 350 to 400 tonnes a year, against about 23,000 tonnes of recycling collected citywide in 2024. 2026 Annual Budget Update, p. 238 (PDF) ↗
Staff report that many municipalities fund recycling for such locations through municipal taxes. No per-stop price from another city was found. 2026 Annual Budget Update, p. 239 (PDF) ↗
AT LONDON'S SCALE: ARITHMETIC SHOWN
$250,000 a year ($200,000 to $300,000) for 535 locations, about $470 a location (derived), and $1.09 a year for the average home. 2026 Annual Budget Update, p. 236 (PDF) ↗
□ SHARED: CITY + PROVINCECouncil decides any City service or fee. The Province defines eligible sources in the Blue Box regulation, O. Reg. 391/21, and producers run the system through Circular Materials.
OPTION 2 OF 8
W12A's landfill gas: keep flaring it, or put it to use
W12A collects its landfill gas and burns it in a flare. A condition of the Province's approval requires the City to re-evaluate using it, with a peer-reviewed report, by April 25, 2028 and every four years after. The choices include flaring, selling renewable natural gas, or pairing it with a future organics plant.
□ SHARED: CITY + PROVINCE■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
For putting it to use: gas flow is modelled to peak in 2049 at about 3,700 cubic feet a minute, more than double the original flare's 1,700. Council directed staff in 2019 to explore supplying renewable natural gas to FortisBC. Landfill gas staff report, Civic Works Committee, Mar 21, 2023 (PDF) ↗
□ SHARED: CITY + PROVINCECouncil decides any investment. The Province set the re-evaluation as Condition 7 of its 2024 approval.
OPTION 3 OF 8
The climate reserve: end it, keep $192,000, or restore $1 million
The Climate Change Reserve Fund gives the City ready money to match federal grants and top up climate projects. Council set it at $1 million a year in February 2024, then cut it to $192,000 in November 2024 to pay for parks maintenance staff. The 2028-2031 budget sets the amount after 2027.
■ CITY DECIDES■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
For keeping or restoring it: staff say the fund gives quick access to money that can be matched with other funding, and Green Municipal Fund grants need upfront City capital. Two current studies get 50% back from that fund. 2026 Annual Budget Update, p. 234 (PDF) ↗
No comparable climate reserve in another Ontario city was found.
AT LONDON'S SCALE: ARITHMETIC SHOWN
$192,000 a year is $0.84 for the average home. Restoring $1 million a year would add $808,000, about $3.50 more for the average home (derived). 2026 Annual Budget Update, p. 231 (PDF) ↗
■ CITY DECIDESCouncil, through the budget. Under strong-mayor rules the Mayor tables the 2028-2031 budget and may veto amendments, and council can override with two-thirds.
OPTION 4 OF 8
The 2030 climate targets: keep them, or rescope now
Keep the adopted targets, 55% below 2005 by 2030 and net zero by 2050, and report against them until the updated plan in 2028. Or adopt now the auditor's interim framework built on levers the City controls, such as its fleet, its buildings, active transportation and density. Management set the third quarter of 2027 for that framework.
■ CITY DECIDESCouncil, on a staff report. Management set the third quarter of 2027 for a revised interim framework and the fourth quarter of 2028 for the updated climate plan.
OPTION 5 OF 8
Green building: pay for incentives, or ask for the power back
Cities can no longer require green standards beyond the Building Code. Council can attach incentives to its voluntary Green Development Framework, such as development charge rebates, grants, faster approvals or extra density. It can also ask Ontario, alone or through AMO, to restore local powers, including EV-charging rules for new buildings.
□ SHARED: CITY + PROVINCECouncil decides the framework, any community improvement plan and any incentive money. The Province sets the limit, through Bill 98 and the Building Code.
OPTION 6 OF 8
BetterHomes retrofit loans: hold at about 150 homes, or grow
BetterHomes London lends homeowners up to $40,000 at 2.5% for energy upgrades, repaid on the property tax bill over 10 to 20 years. Its $6.66 million budget, with an FCM grant and loan, covers about 150 homes. Council could keep that size, seek more FCM money and add flood measures, or point people to existing programs.
■ CITY DECIDES■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
For growing it: the program had 75 consultations and 13 signed agreements by August 20, 2026, and staff say the loan's priority lien on the tax bill reduces the City's financial risk. BetterHomes London staff report, ICSC Oct 5, 2026 (PDF) ↗
Against growing it: three members voted against the program in July 2025, and four supported referring it for a concierge model that would help residents use existing federal, provincial and utility programs instead. Council minutes, July 22, 2025 ↗
■ CITY DECIDESCouncil sets the program and passes each local improvement by-law. The money comes from the City and a grant and loan from FCM (the Federation of Canadian Municipalities), so growing the program depends on FCM approving more funding.
OPTION 7 OF 8
Tree planting: fund the pace staff say the canopy goal needs
Budget for at least 6,000 City trees a year, about $3.2 million at June 2026 prices, keep or grow grants for planting on private land, and pursue a City tree nursery. Or hold near current levels, or trim as a 2026 budget option proposed, $150,000 a year and about 280 fewer trees.
■ CITY DECIDESCouncil, through the budget, which the Mayor tables. Staff set planting targets in the Urban Forest Strategy update, due in 2027.
OPTION 8 OF 8
Parkland from new housing: add the alternative rate
The Planning Act lets a city take up to 5% of residential land as parkland, or use an alternative rate of up to 1 hectare per 600 new units as land, or per 1,000 units as cash, capped at 10% or 15% of the site. The September 2026 master plan update recommends adding that rate to London's by-law.
□ SHARED: CITY + PROVINCECouncil, by by-law under section 42 of the Planning Act, after official plan policy and a parks plan. The Province sets the caps and exemptions, and the Ontario Land Tribunal hears appeals.
What the new council decides, and when
Events on the calendar, not outcomes. Dates the City hasn't set are marked as such.
The EnviroDepot recycling drop-off pilot for small businesses and non-profits that council directed staff to set up is due to end. ICSC minutes, Apr 20, 2026 (PDF) ↗
The next multi-year budget sets the climate reserve contribution after 2027 and the timing of a deferred $19.5 million organics facility. 2026 Annual Budget Update, p. 29 (PDF) ↗
In July 2023 council voted 8 to 7 to close Thames Pool permanently. The motion also asked staff to consult the community on possible new amenities in Thames Park, such as pickleball or basketball courts, to review a splash pad in the area and to study an indoor pool nearby. It capped the cost of those steps at $1.92 million. According to the City's page, construction at Thames Park began in summer 2026 and runs into spring 2027. The design on that page has four pickleball courts, a nature-themed splash pad and playground, a shade structure and more than 30 new trees. The existing tennis courts and community gardens stay. The 2023 motion mentioned pickleball and basketball courts. The page lists pickleball courts only. It repeats the 2023 request for an indoor pool study but does not say what came of it. Staff reported on the indoor pool study in August 2025. Six City properties within 4 kilometres of Thames Park met its criteria. On August 26, 2025 council asked staff to consider Basil Grover Park, at 555 Wharncliffe Road South, for a future community centre with an indoor pool, based on the updated Parks and Recreation Master Plan.
What should the updated Parks and Recreation Master Plan say about an indoor pool near the old Thames Pool, and would you support one at Basil Grover Park?
The Province approved an expansion of the W12A landfill, at 3502 Manning Drive in Ward 14, on April 25, 2024. It adds about 13.8 million cubic metres of capacity, taking the total to 26.3 million. The City has a Community Enhancement and Mitigative Measures Program for the landfill's neighbours. Council updated the landfill's community program in 2025 and 2026. In November 2025 it capped the Community Mitigative Measures Fund at $1.5 million, 15 to 0, and approved an area enhancement fund and extra public property maintenance. In March 2026 it set aside up to $500,000 from the fund for a park at 3137 Scotland Drive. On June 23, 2026 it passed a new program by-law, A.-8731-185. On April 28, 2026 council approved, 12 to 0, expropriating land so the City can meet a condition of the Province's amended approval for the expanded landfill.
Anyone at City Hall can say this issue matters. These are the questions that ask for specifics. Send them to your councillor, or bring them to a committee meeting.
Small businesses, non-profits and places of worship lost City recycling pickup in 2026. Council directed staff to set up a drop-off pilot ending December 2027. After that, should the City offer a paid service, fund pickup from taxes, or leave it to private haulers?
By April 2028 the City must report on using W12A's landfill gas instead of flaring it. What would you need to see before investing in a use?
The climate reserve gets $192,000 a year, down from $1 million in 2024. In the 2028-2031 budget, would you end it, keep it at that level, or raise it, and what would you trade for it?
The City's auditor says the 2030 climate target can't be met. Would you keep the current targets until the 2028 plan update, or rescope them sooner to what the City controls?
Cities can no longer require green building standards beyond the Building Code. Would you fund incentives for builders who go greener, ask the Province to restore local powers, or leave it voluntary?
Staff say the City needs to plant at least 6,000 trees a year, about $3.2 million, to reach its canopy goal. Would you fund that pace, and from where?
Issues in your ward
Jump to the issues from the files that touch your ward:
CLAIMS THAT COULDN’T BE VERIFIED, SO THEY’RE NOT ON THIS PAGE ▾
These circulate in coverage of this issue but could not be traced to a source that loads and says what’s claimed. The site would rather show you the gap than publish the number.
Tonnage received at W12A in 2024 and 2025, and the annual compliance reports the Province's approval requires the City to post.
Why the City's 2025 financial statements moved W12A's expected full date to 2051.
Odour complaint counts at W12A and the findings of the June 2026 staff report on landfill vehicle speeds and odour rules.
London's realized savings from the Blue Box transition. An Environmental Registry comment puts it at $3.5 million to $4 million a year, but we could not open it.
The Green Bin's net cost per household.
A 2025 climate progress report or 2025 emissions inventory.
Whether London's 5% EV-charging zoning rule still applies after Bill 98 took effect on June 2, 2026.
The City's own share of the $6.66 million BetterHomes program.
A measured tree canopy figure after 2015.
Any City estimate of parkland or cash-in-lieu lost to the Province's 2022 changes (Bill 23).
Filter ratings in London's community centres and libraries, and how many people use cooling centres.
The current status of the draft Thames floodplain update after the City's February 2026 review report.