On April 1, 2025 council voted 9 to 6 to restart the Wonderland Road study around six general lanes. City pages still list it as suspended or on hold. Council minutes, April 1, 2025 ↗
The 2028 development-charge study, tabled in early 2027, sets what new construction pays toward growth roads such as Wonderland Road, Sunningdale Road and Bradley Avenue. Get Involved London, 2028 Development Charge Study ↗
Of the 7 options below, council decides 4 and 3 are shared with the Province. See them at a glance
This page is a menu of options, not a plan. It walks through the road and construction choices the new council faces: Wonderland Road, a ring road, arterial roads in growth areas, Wharncliffe Road South, how rapid transit is built, bike lanes, and speed and street safety. For each one it gives the evidence for and against, the London-scale numbers, shown in full or marked as not derivable, and who decides. It recommends nothing.
One structural fact shapes this file. Council owns most of London's roads and pays to keep them up, but the Province sets the floor and some of the limits. It sets the minimum maintenance standards and the development-charge rules, and since late 2025 it bars removing a car lane for a bike lane and has ended municipal speed cameras. Highways 401 and 402 are provincial roads.
For the west and southwest arterials (Sunningdale, Southdale, Bostwick and Oxford), the minutes show routine steps, such as reports accepted, consultants appointed and tenders awarded, and no recorded vote on widening itself. Veterans Memorial Parkway does not appear on any City project page. Dingman Drive's widening, from just east of the Highway 401 overpass to Wellington Road, appears in the City's 2025 development-charge reserve report but on no project page. Wards are listed as touched, not as the place a project sits, from London Decides' own placement on the City's 2026 ward layer, because City pages give no wards.
Research was completed November 4, 2026, and updated on November 13, 2026 for the federal budget. Every claim links to a source, and figures worked out for this page are marked as derived. Rapid transit north and west, London Transit and the Mobility Master Plan vote are in the Transit file, tax rates in the Taxes file, and development-charge rates in the Growth and Planning file. The council that takes office November 15, 2026 decides the questions here, starting with the 2027 budget.
READ EVERY NUMBER HERE WITH THIS
A Yea or Nay on a step, such as restarting a study or asking for a report, is a vote on that step, not on building the road. Votes on this page are shown that way, with the full roll call from the minutes, in alphabetical order.
The options at a glance
Each option gets the same three things: its name, who decides it, and one London number. They're listed in the order the research found them, not ranked.
WHO DECIDESCity staff run it; council can suspend or restart it
Council suspended the Wonderland Road environmental assessment in September 2021 and voted 9 to 6 on April 1, 2025 to restart it. Council minutes, April 1, 2025 ↗
Council awarded the Highbury Avenue South contract on March 31, 2026 at $25,455,593.35 before HST, the lowest of four bids, 13 to 1, and the Wellington Gateway Phase 2B contract on June 23, 2026 at $50,416,071.33, 13 to 1. Council minutes, March 31, 2026 ↗Council minutes, June 23, 2026 ↗
The Province funds some projects, such as Sunningdale Road West, and council has asked it to take over Highbury Avenue from the Thames River South Branch to the south city limits. No answer was found as of November 4, 2026.
The honest numbers
Where London stands, every figure linked to its source.
Road condition and the repair gap
In the City's last full count (2021), 21.7% of roads were rated Poor or Very Poor. Its 2023 plan says holding that condition takes about $89.6 million a year of road renewal, against about $30.1 million planned. 2023 Corporate Asset Management Plan, Tables 7.10 and 7.16 (PDF) ↗
ROAD RENEWAL A YEAR: NEEDED VERSUS PLANNED ($ MILLIONS): TO SCALE
TEN-YEAR INFRASTRUCTURE GAP, ALL CITY ASSETS: TO SCALE
2014 plan$466.1M
2019 plan$568.8M
2023 plan$946.1M
The gap to keep current service over the next ten years, as each plan stated it. Transportation's part rose from $223.0M (2019 plan) to $677.5M (2023 plan). The City gives inflation and better inventory and condition data as reasons, so the plans are not like for like. 2023 Corporate Asset Management Plan, Tables 22.1 and 23.2 (PDF) ↗
BOTH TRUE AT ONCE
21.7%
of London's roads rated Poor or Very Poor in the City's 2021 count
100%
compliance with the province's minimum maintenance standards the same year
In November 2025 the City wrote that over 600 local streets are rated very poor, and that its local road reconstruction program rebuilds 14 to 18 local roads a year. 2026 Annual Budget Update, adopted, p. 162 (PDF) ↗
The 2023 plan puts the transportation gap at $677.5 million over ten years to keep current service, about 72% of the City's $946.1 million total, with roadways about 87% of it. Each year, roads need about $89.6 million of renewal and about $30.1 million was planned. Bridges, culverts and walls need $11.3 million against $6.7 million, and signals, lights and signs $13.8 million against $8.2 million. 2023 Corporate Asset Management Plan, p. 166 and Tables 7.16 and 22.1 (PDF) ↗2026 Annual Budget Update, adopted, p. 164 (PDF) ↗
The plan's figures use 2021 condition data. Council's policy committee received a 2026 progress review on May 28, 2026 with no recorded vote; the staff report itself could not be opened for this page, so its figures are not used here. Strategic Priorities and Policy Committee minutes, May 28, 2026 ↗
The 2026 budget vote
The Mayor's tabled 2026 budget proposed cutting the local road reconstruction program by $114,000 a year (business case P-6). On November 20, 2025 the Budget Committee voted 11 to 4 to exclude that cut, and council adopted the budget on November 26. Yea: Franke, Hillier, Hopkins, Lehman, McAlister, Peloza, Pribil, Rahman, Stevenson, Trosow, Van Meerbergen. Nay: Cuddy, Ferreira, Lewis, Morgan. The program stands at $11.4 million in 2026 and $11.8 million in 2027. Budget Committee minutes, November 20, 2025 ↗Council minutes, November 26, 2025 ↗2026 Annual Budget Update, adopted, pp. 38 and 162 (PDF) ↗
The money
Transportation Services, which includes transit and bridges, is $768.3 million (46.7%) of the 2024-2027 capital plan. The City publishes no roads-only total and no roads split by funding source. 2026 Annual Budget Update, pp. 90-91 (PDF) ↗
READ THE NUMBERS (5 POINTS, WITH SOURCES)▾
Capital plan
Transportation Services is $768.3 million of the $1,643.6 million (46.7%) in the 2024-2027 capital plan, and $1,920.0 million of $3,587.6 million (53.5%) in the 2024-2033 plan. Transportation Services includes transit and bridges. The City publishes no roads-only total and no split by funding source. City of London: 2026 Annual Budget Update, adopted (PDF), pp. 90-91 ↗
Ottawa's Budget 2026, tabled November 5, 2026, expects Build Communities Strong Fund Community Stream payments across Canada to grow from $2.5 billion in 2026-27 to $2.8 billion in 2030-31. The payments go up 2% a year, with each increase added in steps of $100 million. The budget does not give London's share. A budget measure is a proposal until Parliament passes it. Budget 2026, annex 1 (Nov. 5, 2026) ↗
Day-to-day upkeep
The Roadways operating budget, which covers maintenance, winter work and road planning, is $71.5 million in 2026 ($58.6 million from the tax levy) and $72.9 million in 2027 ($59.8 million from the levy), up from $58.2 million in 2023. The City's table does not split out winter maintenance. 2026 Annual Budget Update, adopted, p. 85 (PDF) ↗
Highbury Avenue South
One request would move a road off the City's books. On March 31, 2026 council voted 14 to 0 to endorse asking the Province to take over Highbury Avenue from the Thames River South Branch to the south city limits; every member present voted Yea, and Pribil was absent. CTV London's April 1, 2026 headline says the effort is close, and no provincial answer was found as of November 4, 2026. Council minutes, March 31, 2026 ↗CTV London, April 1, 2026 ↗
The roads fund opened 2025 at $141.3 million. It took in $31.3 million: $23.1 million of charges, $6.2 million of interest and $2.0 million the City paid in to cover exemptions. It paid out $72.9 million, of which $66.9 million was debt payments, and closed at $99.7 million, nearly all set aside for approved projects. Another $231.5 million of road debt to be repaid from future charges was authorized but not yet issued. 2025 Annual Report on Development Charges Reserve Funds (ICSC, May 27, 2026), Appendix A (PDF) ↗
Provincial changes since 2022: Bill 23 (2022) caps the service level a charge can fund at a 15-year average and added rental and affordable-housing exemptions. Bill 185 (2024) ended the mandatory five-year phase-in for new by-laws. Bill 17 (2025) makes residential charges payable in full at occupancy from November 3, 2025. Development Charges Act, 1997 (e-Laws, consolidated from June 2, 2026, archived) ↗
What comes next
The 2028 development-charge study, to be tabled at the Strategic Priorities and Policy Committee in the first quarter of 2027, sets the next list of growth road projects and the rates, with the by-law targeted for January 1, 2028. Council directed in April 2025 that the Wonderland Road widening's cost be used in it. Rates, discounts and who covers them are in the Growth and Planning and Taxes files. Get Involved London, 2028 Development Charge Study ↗Council minutes, April 1, 2025 ↗
The City's winter page sets clearing times after snow stops: Class 1 roads such as Highbury Avenue and Wellington Road, 4 hours; Class 2 roads such as Oxford Street and Dundas Street, 6 hours; Class 3, 12 hours; Class 4, 16 hours; local streets, 24 hours once 10 cm has fallen. Bike lanes follow within 8 to 24 hours and sidewalks within 48 hours. City of London, Winter maintenance (modified February 7, 2025) ↗
On January 26, 2023 the Strategic Priorities and Policy Committee, sitting on the budget, voted 5 to 9 on reducing the added winter maintenance money by $740,000 (business case P-10c), so the money stayed. Yea: Cuddy, Hopkins, Lehman, Lewis, Stevenson. Nay: Ferreira, Franke, McAlister, Morgan, Peloza, Pribil, Rahman, Trosow, Van Meerbergen. Absent: Hillier. Strategic Priorities and Policy Committee (budget) minutes, January 26, 2023 ↗
The 2025 review
On April 22, 2025 council asked staff to review winter performance. Part a), a report on changes to the provincial standards and their effect on City operations, passed 10 to 5. Yea: Ferreira, Franke, Hillier, Hopkins, Lehman, McAlister, Pribil, Rahman, Trosow, Van Meerbergen. Nay: Cuddy, Lewis, Morgan, Peloza, Stevenson. Part b), a review of the 2024/25 winter including contractors, the cost of machines that clear windrows at driveways, and options for roads, laneways and sidewalks, passed 12 to 3. Yea: Ferreira, Franke, Hopkins, Lehman, McAlister, Morgan, Peloza, Pribil, Rahman, Stevenson, Trosow, Van Meerbergen. Nay: Cuddy, Hillier, Lewis. Council minutes, April 22, 2025 ↗
The review costs three additions. Clearing driveway windrows for about 1,000 homes of people who are 65 or older or have a physical disability, as several cities do for a fee: $450,000 to $550,000 a year. Clearing windrows for every home on Toronto's Scarborough model: $9 million to $11 million a year. De-icing sidewalks with persistent ice pack: $1.2 million to $1.4 million a year. Staff did not recommend the added-cost options, citing the Mayor's direction to reduce the expected tax increase. No windrow program and no 2026 change to service levels was found. Winter Maintenance Review, report to the Infrastructure and Corporate Services Committee, August 13, 2025 (PDF) ↗
Road safety, collisions and the end of speed cameras
ROAD LENGTH BY POSTED SPEED LIMIT (DERIVED): TO SCALE
20-30 km/h1.1 km
40 km/h1,250.7 km (67.8%)
50 km/h185.1 km (10.0%)
60 km/h156.4 km (8.5%)
70 km/h43.4 km (2.4%)
80 km/h187.9 km (10.2%)
90-100 km/h19.9 km (1.1%)
Centreline kilometres by posted limit, derived by London Decides from the City's open Speed Limits layer (newest edit August 28, 2025). The City calls the layer unofficial; the Traffic and Parking By-law is the legal source. The 80 to 100 km/h roads are mostly rural roads inside city limits (inference). City of London open data, Speed Limits layer ↗
The City is developing a Safe Mobility Action Plan to update that strategy, with the Middlesex-London Health Unit and London Police. Its page lists data analysis in summer and fall 2026, drafting the plan in winter 2027, and a council date to be determined. Get Involved London, Safe Mobility Action Plan ↗
On October 14, 2025 council voted 15 to 0 to ask the Province to work with municipalities to strengthen the camera program rather than end it. Yea: Cuddy, Ferreira, Franke, Hillier, Hopkins, Lehman, Lewis, McAlister, Morgan, Peloza, Pribil, Rahman, Stevenson, Trosow, Van Meerbergen. The resolution says the cameras brought average speeds down 5 to 7 km/h and that 2024 net revenue of $105,088 went back into road safety. Council minutes, October 14, 2025 ↗
Neighbourhood streets and downtown are posted at 40 km/h, school zones at 40 km/h and Dundas Place at 20 km/h. On July 23, 2024 council voted 5 to 9 on introducing a by-law to lower school-zone speed limits on major streets, and the motion failed. Yea: Ferreira, Franke, Hopkins, Peloza, Trosow. Nay: Cuddy, Hillier, Lehman, Lewis, Morgan, Pribil, Rahman, Stevenson, Van Meerbergen. Absent: McAlister. City of London, Area speed limits (modified November 2, 2026) ↗Council minutes, July 23, 2024 ↗
On November 20, 2025 the Budget Committee added school-zone traffic calming and temporary calming on construction detours, $155,000 operating and $100,000 capital in each of 2026 and 2027. The amendment, changed to fund the operating cost from the Automated Enforcement Reserve Fund for two years rather than the tax levy, passed 8 to 7. Yea: Cuddy, Hillier, Lehman, Lewis, Morgan, Peloza, Pribil, Van Meerbergen. Nay: Ferreira, Franke, Hopkins, McAlister, Rahman, Stevenson, Trosow. Council adopted the budget on November 26, 2025. Budget Committee minutes, November 20, 2025 ↗Council minutes, November 26, 2025 ↗
Residents ask for calming by petition, with at least 10 signatures from the street, and the City says the process does not always lead to installation. On March 3, 2026 council asked staff to report on how other cities handle petitions and on ward-level reporting, with no date set. City of London, Traffic calming (modified December 16, 2025) ↗Council minutes, March 3, 2026 ↗
What the City's own pages say about Wonderland Road
The City's Wonderland Road project page, last updated August 5, 2025, lists the environmental assessment as suspended. The environmental assessment index lists the study as on hold, with detailed design in 2031 and construction in 2033, and also lists the assessment as complete. Both pages read the same on November 4, 2026. City of London, Wonderland Road Environmental Assessment ↗City of London, Environmental assessments ↗
The 2026 budget update, adopted November 26, 2025, says council directed staff in April 2025 to restart the study with limits to Fanshawe Park Road. It keeps $2.05 million for the study in 2024 to 2027 and moves construction money to 2028 and later. No consultant award or study notice for the restarted study was found. 2026 Annual Budget Update, adopted, p. 150 (PDF) ↗
The option space
What cities try for this. Evidence for, evidence against, costs, and who decides, for every option, identically. The site does not pick one. That's council's job, and yours to weigh in on.
OPTION 1 OF 7
Wonderland Road: six general lanes or rapid-transit lanes
Decide what Wonderland Road becomes between Southdale Road and Fanshawe Park Road. Council suspended the environmental assessment for six lanes on September 14, 2021, 9 to 5, noting that the corridor's role would be considered in the Mobility Master Plan. On April 1, 2025 it voted 9 to 6 to restart the study for six general-purpose lanes with a long-term option to convert to rapid transit, and to use the widening's cost in the 2028 development-charge study. Yea: Cuddy, Hillier, Lehman, Lewis, Morgan, Pribil, Rahman, Stevenson, Van Meerbergen. Nay: Ferreira, Franke, Hopkins, McAlister, Peloza, Trosow. Staff had recommended bus-only rapid-transit lanes. The City's 2026 budget records the restart; its project pages still list the study as suspended or on hold.
Staff's model for 2050 shows an afternoon car trip of 23 minutes with six general lanes and 25 minutes with rapid-transit lanes, with congestion back at today's level by the mid-2030s with six general lanes. It shows a transit trip of 63 minutes against 32. These are forecasts, not measured results. City staff report to the Strategic Priorities and Policy Committee, March 25, 2025, Table 1 (PDF) ↗
A U.S. study of highways (Duranton and Turner, 2011) found traffic rose about as fast as lane-kilometres were added, with a smaller effect on other road types. No London measurement was found. Duranton and Turner, American Economic Review, 2011 ↗
AT LONDON'S SCALE: NOT DERIVABLE FROM PUBLIC DATA
The last published cost for the whole widening is about $212 million in 2021, for six lanes from Southdale Road to Sarnia Road. The 2026 budget update keeps $2.05 million for the study in 2024 to 2027, moves $30.5 million of construction money out of that period, and shows $108.7 million in 2028 to 2033. It gives no cost for the six-lane scope to Fanshawe Park Road and no split between development charges and the tax levy. 2026 Annual Budget Update, adopted, pp. 150-152 (PDF) ↗CBC News, September 15, 2021 ↗
■ CITY DECIDESCouncil directs the study, the capital budget and the 2028 development-charge study. The Province approves the road only through the environmental assessment process, and no provincial or federal money has been announced.
OPTION 2 OF 7
A ring road with neighbouring municipalities and the Province
Decide whether to keep pursuing a ring road around London with neighbouring municipalities and the Province. On April 1, 2025 council voted 12 to 3 to ask the Mayor and staff to discuss with them a ring road and an integrated transportation network. Yea: Cuddy, Ferreira, Hillier, Hopkins, Lehman, Lewis, McAlister, Morgan, Pribil, Rahman, Stevenson, Van Meerbergen. Nay: Franke, Peloza, Trosow. The Mobility Master Plan carries the same direction. No route, cost, schedule or report on the talks had been published as of November 4, 2026, and the Mayor told council the motion names no locations or connections.
□ SHARED: CITY + PROVINCE□ COST NOT DERIVABLE
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
A Western University planner told CBC on April 1, 2025 that a ring road is needed because growth already extends beyond the old city limits, and that it should be built together with transit. CBC News, April 1, 2025 ↗
□ SHARED: CITY + PROVINCEThe Province would decide whether any provincial highway is built, and neighbouring municipalities control land outside London. Council decides whether to keep pursuing the talks and what it asks for.
OPTION 3 OF 7
Widen and extend arterial roads in growth areas
Decide which arterial roads serving new neighbourhoods are widened or extended, and when. The City's pages list Sunningdale Road West (two to four lanes, Wonderland Road to Villagewalk Boulevard, 2026 to 2028), Southdale Road West (construction spring 2027), Bostwick Road (spring 2028), Oxford Street West (Westdel Bourne to Commissioners Road, 2027) and the Bradley Avenue Extension. Council's yearly growth-infrastructure updates moved Bradley Avenue from Wonderland Road to Bostwick Road from 2028 to 2033 on July 22, 2025, and to 2035 on July 21, 2026, with no recorded roll call. The minutes show routine steps for these roads and no recorded vote on widening itself.
■ CITY DECIDES□ COST NOT DERIVABLE
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
The Mobility Master Plan, approved July 22, 2025, includes $2.1 billion to $2.2 billion of road projects to 2050 alongside its target of at least 32.5% of trips by walking, cycling and transit, so the widenings and the target sit in the same plan. Mobility Master Plan, Exhibit 5.1, p. 107 (PDF) ↗
Growth roads are paid mostly from development charges. CTV reported that 2025 development-charge revenue came in about $40 million below what the funds paid out, and the 2026 budget moved Wonderland, Sunningdale and other road money later, giving pressure on that revenue as a reason. CTV London, May 30, 2026 ↗2026 Annual Budget Update, adopted, pp. 149-161 (PDF) ↗
■ CITY DECIDESCouncil sets timing through the yearly growth-infrastructure plan, the capital budget and the 2028 development-charge study. The Province funds some projects, such as Sunningdale Road West.
OPTION 4 OF 7
Wharncliffe Road South: the rail underpass and the Oxford intersection
Decide when to fund two Wharncliffe Road projects. The Wharncliffe Road South improvements add a northbound lane from Horton Street to Becher Street and replace the CN rail bridge north of Horton. The 2024-2027 budget listed a $39.6 million cost increase for this grade separation as business case P-54, marked Not Approved, and the City's page says construction timing depends on future budgets. Separately, in January 2024 council asked the Province to move $6.5 million of federal-provincial infrastructure money from the Oxford Street and Wharncliffe Road intersection to the Wellington Gateway rapid transit line. Committee voted 13 to 1 on January 16. Yea: Cuddy, Ferreira, Franke, Hillier, Hopkins, Lewis, McAlister, Morgan, Peloza, Pribil, Rahman, Stevenson, Trosow. Nay: Van Meerbergen. Absent: Lehman. Council voted 9 to 6 on January 23. Yea: Ferreira, Franke, Hillier, Hopkins, McAlister, Morgan, Peloza, Rahman, Trosow. Nay: Cuddy, Lehman, Lewis, Pribil, Stevenson, Van Meerbergen.
The Mayor's January 2024 budget did not include it. He told CTV the delay would be about 18 to 24 months, with the CN Rail agreement to be finished in time for the funding decision. CTV London, July 25, 2024 (archived) ↗
On the intersection, Mayor Morgan told Global News in January 2024 that moving the $6.5 million took pressure off the tax base, since the City would otherwise borrow for rapid transit cost overruns. About $12 million stayed with the intersection. Global News, January 17, 2024 ↗
■ CITY DECIDESCouncil decides the funding in the 2028-2031 multi-year budget and the growth share in the 2028 development-charge study. CN Rail's share and schedule are set by agreement, which was not final in anything found.
OPTION 5 OF 7
How the rapid transit lines under construction are built
Decide how the rapid transit lines already under construction are staged: work hours, how many streets close at once, access for businesses, and what the City offers shops that lose customers. Wellington Gateway Phase 2B started August 31, 2026 and runs through 2029, with restoration into 2030. East London Link Phase 5 has closed Dundas Street between McCormick Boulevard and Highbury Avenue since March 16, 2026, with work through 2027, final asphalt in 2028 and no reopening date. The project page says fully closed to traffic, while the City's March 2026 presentation says reduced lanes. Whether to build the north and west lines is in the Transit file.
■ CITY DECIDES□ COST NOT DERIVABLE
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
CBC reported on April 1, 2026 that Wellington Road business owners described falls in customers. The City's construction director said the Municipal Act gives the City no mechanism to compensate business losses, and that the City has two business relations coordinators. CBC News, April 1, 2026 ↗
The rapid transit work runs at the same time as the City's 2026 Renew program, about $285 million in new projects across more than 100 lane-kilometres of road and 20 intersections. City of London, 2026 Renew construction program ↗
■ CITY DECIDESCouncil sets contract terms and the construction program; a compensation program would need a new City policy within provincial law. Staff and contractors set the staging. Senior governments fund part of the lines but do not set the schedule.
OPTION 6 OF 7
Bike lanes and complete streets
Decide how much of the Mobility Master Plan's cycling network is built, where, and in what order. Council approved the plan on July 22, 2025, 10 to 2, with a target of at least 32.5% of trips by walking, cycling and transit by 2050, up from 23% in 2019. Yea: Ferreira, Franke, Hopkins, Lehman, Lewis, McAlister, Morgan, Pribil, Rahman, Trosow. Nay: Stevenson, Van Meerbergen. Absent: Cuddy, Hillier, Peloza. On April 1, 2025 council removed seven proposed additions from the cycling maps in five votes and kept Huron Street as a medium-term project. Since November 27, 2025, Ontario law bars any municipality from removing a car lane to add a bike lane unless a provincial regulation allows it. Council still decides lanes that keep every car lane.
□ SHARED: CITY + PROVINCE■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
A study of 690 injured cyclists in Toronto and Vancouver found cycle tracks carried about one-ninth the injury risk of major streets with parked cars and no bike infrastructure (odds ratio 0.11, with a wide confidence interval). It counted injured riders, not how much people ride. Teschke et al., American Journal of Public Health, 2012 (PMID 23078480) ↗
The plan sets cycling at 4.5% of trips by 2050, from about 2% in 2019, and says the target is ambitious but can be met with significant mobility infrastructure. Mobility Master Plan, pp. 27-28 (PDF) ↗
The City says about 27 kilometres of new bike lanes are being built in 2026, including on Boler Road, Clarke Road, Kilally Road and the widened Sunningdale Road. The City announced on November 4, 2026 that the Boler Road work was complete, with some remaining work left for spring 2027. City of London, Biking ↗City of London, Boler Road improvements are complete (Nov. 4, 2026) ↗
EVIDENCE AGAINST / LIMITS
Cycling was about 2% of London trips in 2019, and the plan says some existing routes experience low ridership and offer little separation from traffic. Mobility Master Plan, section 4.5.1 (PDF) ↗
The 2024-2027 budget identifies no money for operating boulevard bike lanes. In February 2024 the Budget Committee voted 4 to 11 on an amendment to fund their sweeping and plowing at $300,000 a year. Yea: Franke, Hopkins, Peloza, Trosow. Nay: Cuddy, Ferreira, Hillier, Lehman, Lewis, McAlister, Morgan, Pribil, Rahman, Stevenson, Van Meerbergen. 2024-2027 Multi-Year Budget, business case P-53 (PDF, archived copy) ↗Budget Committee minutes, February 8, 2024 ↗
Cycling is $170 million to $190 million of the plan's roughly $2.84 billion to $3.06 billion in capital estimates to 2050, about 6% (derived), in 2025 dollars and before operating costs. Roads are $2.1 billion to $2.2 billion. Mobility Master Plan, Exhibit 5.1, p. 107 (PDF) ↗
□ SHARED: CITY + PROVINCECouncil approves the routes, their order and their money in the multi-year budget. The Province decides, by regulation under the Highway Traffic Act, whether a lane that removes a car lane may go ahead, and may order reviews of existing lanes in municipalities it names. No regulation naming London was found.
OPTION 7 OF 7
Speed limits, traffic calming and street safety
Decide how London slows traffic with the tools council still controls: speed limits, traffic calming, roundabouts and the Safe Mobility Action Plan. Speed cameras are now the Province's call, not council's. Bill 56 repealed automated speed enforcement on November 14, 2025, and London's seven school-zone cameras came down, after council voted 15 to 0 to ask the Province to strengthen the program instead. Red-light cameras remain legal. Council voted 5 to 9 in July 2024 on lowering school-zone speed limits on major streets, and 8 to 7 in November 2025 on funding school-zone calming from the camera reserve for 2026 and 2027; the roll calls are in the road safety card above. The City is drafting a Safe Mobility Action Plan in winter 2027, with no council date set.
□ SHARED: CITY + PROVINCE■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
Council's October 14, 2025 resolution says London's school-zone cameras brought an average speed decrease of 5 to 7 km/h. Council minutes, October 14, 2025 ↗
U.S. studies summarized by the Insurance Institute for Highway Safety found that converting intersections to roundabouts cut injury crashes by 72% to 80%, mostly at single-lane roundabouts. Insurance Institute for Highway Safety, Roundabouts ↗
□ SHARED: CITY + PROVINCECouncil sets speed limits on City roads by by-law, runs the calming program and approves the Safe Mobility Action Plan and its budget. The Province ended speed cameras, sets red-light camera rules and runs the Road Safety Initiatives Fund. Police enforce speed limits.
What the new council decides, and when
Events on the calendar, not outcomes. Dates the City has not set are marked as such.
The Mayor must table the 2027 budget update, the last year of the 2024-2027 multi-year budget. Council then has up to 30 days to amend it. 2026 Annual Budget Update, p. 23 (PDF) ↗
The Safe Mobility Action Plan, which replaces the 2014 road safety strategy, is scheduled to be drafted. A date for council approval has not been set. Get Involved London, Safe Mobility Action Plan ↗
Funding for school-zone traffic calming and temporary calming on construction detours from the Automated Enforcement Reserve Fund runs through 2027 only. Budget Committee minutes, November 20, 2025 ↗
Final surface asphalt on Dundas Street for East London Link Phase 5. The City has published no date for reopening Dundas to through traffic. Get Involved London, East London Link ↗
The next multi-year budget, which CTV London reported is where the Wharncliffe Road grade separation's $39.6 million cost increase will be decided. CTV London, July 25, 2024 (archived) ↗
The next multi-year budget, where the Mobility Master Plan says its road, transit and cycling projects get detailed phasing and funding. Mobility Master Plan, p. 107 (PDF) ↗
Road work that is under way or under contract now.
■ CITY DECIDES
Highbury Avenue South rebuild, 2026 and 2027
The City is rebuilding Highbury Avenue South from the Thames River to Highway 401, and most of that corridor is in Ward 14. Phase 1 started in May 2026 and runs from the Thames River bridge to just south of Commissioners Road East. Phase 2, from there to Highway 401 including the Bradley Avenue underpass, starts in spring 2027, and the City expects construction to end in November 2027. Traffic stays at one lane each way, with signed ramp detours. On March 31, 2026, council awarded the construction contract at $25,455,593.35 before HST, the lowest of four bids, by a vote of 13 to 1 (Nay: Hillier; absent: Pribil; every other member Yea). The same day, council voted 14 to 0 to endorse transferring responsibility for Highbury Avenue from the Thames River South Branch to the south city limits to the Province of Ontario and to forward that resolution to the Ministry of Transportation; every member present voted Yea, and Pribil was absent. No provincial response had been found as of November 4, 2026.
The honest numbers ▾
The City's project page says Phase 1 started in May 2026, and that Phase 2 starts in spring 2027 with construction expected to end in November 2027, with one lane each way and signed ramp detours. The council minutes of March 31, 2026, item 2.13, record that the construction contract (tender RFT-2025-270) was awarded at $25,455,593.35 excluding HST, the lowest of four bids, 13 to 1; the amendment endorsing the transfer of Highbury Avenue to the Province passed 14 to 0. City of London, Highbury Avenue South project page ↗City of London, Council minutes, March 31, 2026 ↗
Ask your councillor
What should the City tell residents and businesses about detours and timing before Phase 2 starts in spring 2027, and what should council do next on its request that the Province take over the road?
The City's 2026 Renew program covers roadwork, intersections and underground work citywide.
The honest numbers ▾
About $285 million in new projects plus about $100 million in ongoing work from last year, covering more than 100 lane-kilometres of road, 20 intersections and more than 30 km of new or replaced underground pipes. City of London ↗
Ask your councillor
Which road and sidewalk projects are planned in each ward for 2026 and 2027, and when will council see the list?
■ CITY DECIDES
Kilally Road reconstruction and the Highbury towers appeal
The Kilally Infrastructure Project is rebuilding Kilally Road from Webster Street to Clarke Road. The City's project page gives two dates. Its timeline lists Kilally Road, Webster Street to Clarke Road, for completion in December 2026. Its questions section says the road stays closed until mid-December 2026, reopens for the winter, and work resumes in spring 2027, with completion expected in early to mid-summer 2027. Final paving and landscaping are listed for 2027. The JW Carson Bridge closure on Clarke Road was scheduled for July 13 to August 14, 2026. According to the City's ward data, Kilally Road addresses in the project area are in Ward 3 under the boundaries that start November 15, 2026, while some addresses west of Highbury Avenue move to Ward 4. Nearby, 1470-1474 Highbury Avenue North (three 14-storey apartment buildings) stays in Ward 3. On September 9, 2025, the Planning and Environment Committee voted 5 to 0 to refuse the zoning change, on staff's recommendation. Reasons in the record include groundwater, the timing of a hydrogeological study, compatibility and setback from a high-pressure pipeline. The developer appealed, and the Ontario Land Tribunal has set a 10-day hearing for February 1 to 12, 2027.
How should council and staff coordinate with Ward 4 on Kilally Road and Highbury Avenue, and what should council be told about the City's position at the 2027 tribunal hearing?
Sunningdale Road West is being widened from two lanes to four between Wonderland Road and Villagewalk Boulevard, with sidewalks, cycle tracks and a new Medway Creek bridge. Phase 1 (Wonderland to Medway Creek) is in 2026, with bridge work into 2027. Phase 2 (Medway Creek to Villagewalk) is planned for 2027 to 2028. Separately, the Sunningdale and Richmond intersection rebuild started in May 2025, and the City lists it as finishing in August or fall 2026.
The honest numbers ▾
The Province committed more than $18 million to the Wonderland to Villagewalk widening, announced August 14, 2025. The City's release does not give a total project cost. On October 5, 2026 a council committee recommended raising the Sunningdale and Richmond intersection contract by $700,000, to $8,586,917.50 before HST. It went to council on October 14, 2026, and those minutes were not posted as of November 4, 2026. City of London ↗Infrastructure and Corporate Services Committee minutes, October 5, 2026, item 2.8 ↗
Ask your councillor
What is the schedule for finishing both Sunningdale projects, and what traffic arrangements are planned while they overlap?
The City is turning Colonel Talbot Road from a two-lane rural road with ditches and gravel shoulders into a two-lane urban road connecting Talbot Village and Lambeth. It will have sidewalks, multi-use pathways and boulevard bike paths. The City lists the third stage as 2026, covering surface asphalt, restoration, landscaping and clean-up of deficiencies.
The honest numbers ▾
The City's notice for overnight paving on June 1 and 2, 2026 said underground servicing and drainage were complete. The project page gives 2026 for the final stage and no completion date. No City update after June was found as of October 28, 2026. City of London – Colonel Talbot Road project enters final paving stage ↗
Ask your councillor
When will the Colonel Talbot Road upgrade be finished, and how will residents report problems found after the work ends?
The Bradley Avenue Extension is being built near the Wellington Road transit work. It has two parts. One is a new four-lane road from Wharncliffe Road South to White Oak Road. The other widens existing Bradley Avenue from two lanes to four between White Oak Road and Jalna Boulevard. The west end at Wharncliffe Road South touches Ward 10, and the rest of the work is in Ward 12.
The honest numbers ▾
The City says work began in June 2025 and is expected to be mostly finished by fall 2026. Landscaping and the final asphalt layer are scheduled for spring 2027. The City's page shows no update date. The finished road is to be a four-lane street with sidewalks, in-boulevard bike lanes, street lighting and landscaping. On October 5, 2026 a council committee recommended raising the White Oaks Complete Corridor engineering contract with Onterris Canada by $492,370.01, to $1,143,079.34 before HST. City of London - Bradley Avenue Extension ↗Infrastructure and Corporate Services Committee minutes, October 5, 2026, item 2.5 ↗
Ask your councillor
What should the City do to keep access to homes and businesses open while Bradley Avenue and Wellington Road work overlap?
The Queen's Bridge rehabilitation and future rapid transit
The Downtown Loop (bus-only lanes on King, Wellington, Queens and Ridout) was completed in 2024. Rehabilitation of The Queen's Bridge started March 2, 2026 and is expected to finish by May 2027, in two stages, the north half and then the south half. No stage dates are published. One traffic lane and one sidewalk stay open on Queen's Avenue from Ridout Street North to Wilson Avenue. The City's staff report says replacing the deck is a chance to widen the bridge slightly for a multi-use path on the north side while also accommodating future rapid transit lanes. The contract covers the bridge rehabilitation.
The honest numbers ▾
Council awarded the construction contract to McLean Taylor Construction at $10,218,553.35 excluding HST, the lowest of six bids. With the $1.5-million contingency the figure is $11,718,553.35. A 2025 inspection rated the bridge "poor to fair." The staff report describes one weekend closure for placing the concrete deck, with at least a week's public notice, and no date has been announced. Funding comes from the transportation, rapid transit, traffic and stormwater capital budgets. Contract Award: Tender RFT-2025-258, staff report (PDF) ↗
Ask your councillor
What should council know about cost, timing and route before any decision on the west and north rapid transit legs?
Western Road and Sarnia Road/Philip Aziz Avenue, Phase 2
Council's October 14, 2026 agenda included a by-law (Bill 353) to expropriate land for Phase 2 of the Western Road and Sarnia Road/Philip Aziz Avenue corridor and intersection work. On October 5, 2026 a council committee recommended cutting the intersection project's budget by $8.7 million. The October 14 minutes were not posted as of November 4, 2026, so the outcome is not recorded here.
Part of the roads file until it has enough of its own.
■ CITY DECIDES
Cycling routes in the Mobility Master Plan
On April 1, 2025, council removed seven proposed additions from the Mobility Master Plan cycling network maps, in five votes, and kept Huron Street as a medium-term project. On July 22, 2025, council approved the plan 10 to 2. Yea: Ferreira, Franke, Hopkins, Lehman, Lewis, McAlister, Morgan, Pribil, Rahman, Trosow. Nay: Stevenson, Van Meerbergen. Absent: Cuddy, Hillier, Peloza. The plan sets a target for walking, cycling and transit to make up at least 32.5% of trips by 2050. Its capital table puts cycling at $170 million to $190 million of about $2.9 billion, labelled initial estimates subject to council approval through future multi-year budgets. Since November 27, 2025, Ontario law bars removing a car lane to add a bike lane unless a provincial regulation allows it, so council's choices are now about lanes that keep every car lane. The Old North East Neighbourhood Association sent a letter to council about the routes on Huron, Taylor, McNay and Gammage streets.
The honest numbers ▾
The April 1, 2025 votes went as follows. Royal Crescent east of Clarke Road to Wexford Avenue to Admiral Drive, removed 13 to 2; Sovereign Road, 11 to 4; Vancouver Street from Trafalgar Street to Wavell Street, 11 to 4; Taylor, McNay and Gammage streets in one motion, 10 to 5; the Windermere Road to Gainsborough Road active transportation connection, 14 to 1. A motion to remove Huron Street failed 5 to 10, and Huron Street was changed to a medium-term project 14 to 1. The plan’s capital table (2025 dollars, to 2050) lists roads at $2,100 million to $2,200 million, transit $550 million to $650 million, cycling $170 million to $190 million and sidewalks on major roads $20 million, roughly $2.84 billion to $3.06 billion in all. Council minutes, April 1, 2025 ↗Council minutes, July 22, 2025 (PDF) ↗Mobility Master Plan, final (PDF, 144 pp.) ↗Highway Traffic Act (e-Laws, consolidated from July 1, 2026, archived October 26, 2026) ↗
Ask your councillor
Should the next multi-year budget fund the plan’s cycling routes, and if so, which first?
Jul 22, 2025Council approved the Mobility Master Plan Report and directed staff to file a Notice of Completion and make the report available for the statutory 30-day public review period.Passed 10-2 (3 absent) · Minutes
Road safety
■ CITY DECIDES
Hamilton Road safety, Adelaide Street to Highbury Avenue
On August 27, 2024, council voted 5 to 10 against a motion to direct staff to include an update for Hamilton Road between Adelaide Street and Highbury Avenue in the Mobility Master Plan, which could have included three lanes, protected bike lanes and accessible sidewalks, with any large redesign weighed in the 2028 to 2031 budget. The motion was defeated. Yea: Ferreira, Franke, Hopkins, McAlister, Trosow. Nay: Cuddy, Hillier, Lehman, Lewis, Morgan, Peloza, Pribil, Rahman, Stevenson, Van Meerbergen. Council then voted 15 to 0 to receive the communication on the matter. Council approved the Mobility Master Plan on July 22, 2025, 10 to 2.
The honest numbers ▾
On August 27, 2024, council voted 5 in favour and 10 against directing staff to include a Hamilton Road update in the Mobility Master Plan, so the motion was defeated. Council then voted 15 to 0 to receive the communication. City of London, Council minutes, August 27, 2024 ↗
Ask your councillor
What, if anything, should the City do next on Hamilton Road between Adelaide and Highbury, and when should council see it?
In November 2023 council approved the Huron Heights Neighbourhood Connectivity Plan, which guides which streets get sidewalks through the City's annual Renew London construction program. The plan also exempts many crescents and courts from the City's sidewalk policy. Most of Huron Heights, including every street named in the plan, is in Ward 3.
The honest numbers ▾
On November 28, 2023 council voted 13 to 2 to approve the plan except the proposed Kaladar Drive, Cayuga Crescent and Mark Street sidewalks. Michael Street, which a committee had excluded, was put back in 15 to 0. Council minutes, November 28, 2023, item 6 clause 3.2 ↗
Ask your councillor
What is your position on the timing of the Connectivity Plan sidewalks and on the streets exempted from sidewalks?
Sidewalk on Hyde Park Road north of Fanshawe Park Road
CBC News reported on July 29, 2026 that the sidewalk on Hyde Park Road just north of Fanshawe Park Road ends, and that people on foot cut through a parking lot to get past the gap. No City record of the gap or a plan to fill it has been located.
The honest numbers ▾
CBC News reported on July 29, 2026 that a short stretch of Hyde Park Road just north of Fanshawe Park Road has no sidewalk, and that people walking south often cut through a store parking lot instead. CBC News, July 29, 2026 ↗
Ask your councillor
Is there a plan to extend the sidewalk on Hyde Park Road north of Fanshawe Park Road, and if so, what are its cost and date?
London's Renew program covers roadwork, intersections and underground work citywide. No 2026 list of sidewalk projects for the new Ward 3 was found, so this issue names none.
The honest numbers ▾
The City's 2026 Renew program is about $285 million in new projects plus about $100 million in ongoing work from last year, across all project types. It is not a sidewalk-only figure. City of London ↗
Ask your councillor
Which sidewalk and road projects are planned in Ward 3, and when will council see the list?
Decisions that have been made but are not yet built.
■ CITY DECIDES
Wonderland Road: the restarted study for six general lanes
In September 2021 council suspended the Wonderland Road environmental assessment. Climate and environmental concerns were given as the reason. On March 25, 2025 the Strategic Priorities and Policy Committee, and on April 1, 2025 council, voted 9 to 6 to restart it from Southdale Road to Fanshawe Park Road, to build six general-purpose lanes with a long-term option to convert to bus rapid transit. Yea: Cuddy, Hillier, Lehman, Lewis, Morgan, Pribil, Rahman, Stevenson, Van Meerbergen. Nay: Ferreira, Franke, Hopkins, McAlister, Peloza, Trosow. Staff had recommended bus-only rapid-transit lanes. At the same meeting council voted 12 to 3 to ask for talks with neighbouring municipalities and the province about a ring road. Yea: Cuddy, Ferreira, Hillier, Hopkins, Lehman, Lewis, McAlister, Morgan, Pribil, Rahman, Stevenson, Van Meerbergen. Nay: Franke, Peloza, Trosow. The City's 2026 budget update records the restart and keeps $2.05 million for the study. No schedule or cost for the widening has been published, and this page found no route, cost or report for a ring road since. The road touches Wards 5, 6, 7, 8, 10, 11 and 13 (Ward 13 for only about 160 metres).
The honest numbers ▾
In the council minutes of April 1, 2025, part e), restarting the study, passed 9 to 6 (the committee vote on March 25, 2025 was also 9 to 6), and part f) asking for ring-road talks passed 12 to 3. The staff report told council that six general-purpose lanes between Fanshawe Park Road and Southdale Road would leave the 2050 afternoon drive at 23 minutes, against 25 minutes with the rapid-transit lanes staff recommended and 24 minutes today. The motion also directed that the widening’s estimated cost be used in the 2028 development-charges study. CBC News reported on July 29, 2026 that Wonderland Road carries about 48,000 vehicles a day. The City's Wonderland Road Environmental Assessment page, last updated August 5, 2025, lists the Discover Wonderland assessment as suspended since September 2021 and says the road's role will be set in the Mobility Master Plan. Council minutes, April 1, 2025 ↗City of London staff report to Strategic Priorities and Policy Committee, Mar. 25, 2025 (PDF) ↗City of London, Wonderland Road Environmental Assessment ↗CBC News, July 29, 2026 ↗2026 Annual Budget Update, adopted, p. 150 (PDF) ↗
Ask your councillor
What schedule and cost should the City publish for the restarted Wonderland Road study, and what should council weigh between six general lanes and rapid-transit lanes?
Apr 1, 2025Council directed staff to restart the Discover Wonderland Road environmental assessment from Southdale Road to Fanshawe Park Road, to build six general-purpose lanes with a long-term option to convert to bus rapid transit, and to use the widening's estimated cost in the 2028 Development Charges Background Study.Passed 9-6. Strategic Priorities and Policy Committee had voted 9-6 on March 25, 2025. · Minutes
■ CITY DECIDES
Hamilton Road at Gore Road: roundabout timing
The City's environmental assessment chose a roundabout for Hamilton Road at Gore Road. The project is in detailed design. The City's two project pages give different construction years. The london.ca page says construction is anticipated in 2027, subject to property acquisition and approvals, though a timeline line on the same page says 2026. The Get Involved London page timeline says tentatively 2028.
The honest numbers ▾
The City's project page (last modified March 27, 2026) says detailed design is underway and construction is anticipated in 2027, subject to property acquisition, approvals and coordination with other projects. City of London (Gore Road and Hamilton Road project page) ↗
Ask your councillor
What construction date should council expect for the Gore Road and Hamilton Road roundabout, and how often should it get an update?
Cut-through traffic in Old North: what the City's plan proposes
Residents have raised speeding, cut-through traffic and unsafe walking and cycling conditions in Old North. The City's Central North London Traffic Study covers the area between Richmond Street, Oxford Street, the Thames River and Adelaide Street. Its recommended plan, shown on June 18, 2026, would steer through-traffic onto Cheapside, Colborne and Huron/Regent Streets and larger roads. It uses directional diverters and median islands, first as a pilot with temporary materials. Feedback closed July 22, 2026. The City's project page lists implementation starting in 2028, pending funding and approvals, and does not say whether council approval is needed.
The honest numbers ▾
The comment period closed July 22, 2026. The project page lists study completion for summer 2026 and implementation starting in 2028, pending funding and approvals. As of November 5, 2026 no final report is posted. City of London (Get Involved project page) ↗
Ask your councillor
The City says this plan can go ahead without a council vote. What role, if any, should council have in it, and what would you want the final report to show? (Editor's note, November 5, 2026: the City's project page no longer says whether a council vote is needed. It now lists implementation starting in 2028, pending funding and approvals.)
Where this file meets the Transit, Taxes, Growth and Planning and Safety files
The Transit file (/files/transit/) covers whether to build rapid transit north and west, the rapid transit budget, London Transit and the Mobility Master Plan's transit side. This file covers only how the lines under construction are built. Council minutes, July 22, 2025 (PDF) ↗
The Taxes file (/files/taxes/) covers the tax levy and the City's whole repair backlog. The Growth and Planning file (/files/growth-and-planning/) covers development-charge rates, discounts and the 2028 by-law. This file uses only the roads figures. Get Involved London, 2028 Development Charge Study ↗
Anyone at City Hall can say this issue matters. These are the questions that ask for specifics. Send them to your councillor, or bring them to a committee meeting.
Staff recommended rapid-transit lanes on Wonderland Road and council voted 9 to 6 to restart the study around six general lanes. What should the study compare, and when should council see a cost?
The City's 2023 plan says roads need about $89.6 million a year of renewal and about $30.1 million was planned. In the 2028-2031 budget, would you raise renewal spending, accept a lower road condition, or move money from other projects, and which?
The roads development-charge fund paid out more than twice what it took in during 2025. In the 2028 study, would you add growth roads, delay some, or pay for more from the tax levy?
London clears roads on the province's minimum timetable. Would you keep that, pay for faster clearing or windrow clearing, and what would you trade for it?
Ontario now bars removing a car lane for a bike lane unless a regulation allows it. Would you build the plan's routes only where car lanes stay, ask the Province for exemptions, or change the plan?
School-zone calming is funded from the camera reserve for 2026 and 2027 only. After that, would you fund calming, lower speed limits or roundabouts from the tax levy, rely on the Province's road safety fund, or neither?
The $39.6 million Wharncliffe Road underpass increase was left for the 2028-2031 budget. Would you fund it then, and from what?
Issues in your ward
Jump to the issues from the files that touch your ward:
CLAIMS THAT COULDN’T BE VERIFIED, SO THEY’RE NOT ON THIS PAGE ▾
These circulate in coverage of this issue but could not be traced to a source that loads and says what’s claimed. The site would rather show you the gap than publish the number.
A $400 million cost for widening Wonderland Road. CBC attributed it to staff in April 2025; the March 25, 2025 staff report has no such figure.
The 2021 climate screening of the Wonderland widening, reported by CBC. The staff report itself was not read.
Road condition, the transportation gap and the full plan update date from the 2025 and 2026 asset management progress reviews. The staff reports could not be opened; only an automated transcript mentions their figures.
A yearly series of London collisions, injuries and deaths. London Police publish 2024 only; the City publishes no series.
Pothole counts or a London pothole repair target. None is published; the provincial minimums apply.
London's yearly allocation from the federal Build Communities Strong Fund Community stream (formerly the Canada Community-Building Fund) and how much goes to roads.
Which 2026 and 2027 cycling projects, if any, were redesigned because of the 2025 car-lane rule, and whether the City asked for any exemption.
How London is spending its $1.29 million Road Safety Initiatives Fund share, and the Automated Enforcement Reserve Fund balance.
How many intersections run red-light cameras in 2026. The City's page dates from December 2024.
A provincial answer on taking over Highbury Avenue South, and who said the effort was close in CTV's April 1, 2026 story.
Dollar figures for the Dingman Drive widening in the 2025 development-charge reserve report.
A $980,000 north rapid transit study figure from a campaign page.
The date council adopted the 40 km/h area speed limit policy, and the calming standards for new subdivisions in the October 2025 staff report.