The Roads and Construction File

THE SHORT VERSION

a year of road renewal needed to hold 2021 condition; $30.1M a year planned (2023 plan) 2023 Corporate Asset Management Plan, Table 7.16 (PDF) ↗
$89.6M
of London's roads rated Poor or Very Poor in the City's 2021 count 2023 Corporate Asset Management Plan, Table 7.10 (PDF) ↗
21.7%
paid out of the roads development-charge fund in 2025; $31.3M came in DC reserve funds report (PDF) ↗
$72.9M
school-zone speed cameras removed after Ontario ended them, November 14, 2025 City of London, Road safety ↗
7

This page is a menu of options, not a plan. It walks through the road and construction choices the new council faces: Wonderland Road, a ring road, arterial roads in growth areas, Wharncliffe Road South, how rapid transit is built, bike lanes, and speed and street safety. For each one it gives the evidence for and against, the London-scale numbers, shown in full or marked as not derivable, and who decides. It recommends nothing.

One structural fact shapes this file. Council owns most of London's roads and pays to keep them up, but the Province sets the floor and some of the limits. It sets the minimum maintenance standards and the development-charge rules, and since late 2025 it bars removing a car lane for a bike lane and has ended municipal speed cameras. Highways 401 and 402 are provincial roads.

For the west and southwest arterials (Sunningdale, Southdale, Bostwick and Oxford), the minutes show routine steps, such as reports accepted, consultants appointed and tenders awarded, and no recorded vote on widening itself. Veterans Memorial Parkway does not appear on any City project page. Dingman Drive's widening, from just east of the Highway 401 overpass to Wellington Road, appears in the City's 2025 development-charge reserve report but on no project page. Wards are listed as touched, not as the place a project sits, from London Decides' own placement on the City's 2026 ward layer, because City pages give no wards.

Research was completed November 4, 2026, and updated on November 13, 2026 for the federal budget. Every claim links to a source, and figures worked out for this page are marked as derived. Rapid transit north and west, London Transit and the Mobility Master Plan vote are in the Transit file, tax rates in the Taxes file, and development-charge rates in the Growth and Planning file. The council that takes office November 15, 2026 decides the questions here, starting with the 2027 budget.

READ EVERY NUMBER HERE WITH THIS

A Yea or Nay on a step, such as restarting a study or asking for a report, is a vote on that step, not on building the road. Votes on this page are shown that way, with the full roll call from the minutes, in alphabetical order.

The options at a glance

Each option gets the same three things: its name, who decides it, and one London number. They're listed in the order the research found them, not ranked.

  1. Wonderland Road: six general lanes or rapid-transit lanes
    ■ CITY DECIDES$108.7 million for Wonderland widening in the City's 2028 to 2033 capital forecast
  2. A ring road with neighbouring municipalities and the Province
    □ SHARED: CITY + PROVINCEAbout $500 million in a 2001 study, the last published ring road cost
  3. Widen and extend arterial roads in growth areas
    ■ CITY DECIDESBradley Avenue West moved from 2028 to 2035 in two yearly growth-plan updates
  4. Wharncliffe Road South: the rail underpass and the Oxford intersection
    ■ CITY DECIDES$39.6 million rail underpass cost increase, marked Not Approved in the 2024 budget
  5. How the rapid transit lines under construction are built
    ■ CITY DECIDES$50.4 million Wellington Gateway Phase 2B contract, with work running through 2029
  6. Bike lanes and complete streets
    □ SHARED: CITY + PROVINCE$170 million to $190 million for cycling in the plan's estimates to 2050
  7. Speed limits, traffic calming and street safety
    □ SHARED: CITY + PROVINCE$255,000 a year for school-zone calming in 2026 and 2027, from the camera reserve

How a road project moves, and who decides each step

  1. The rules

    WHO DECIDESProvince of Ontario

    Ontario sets minimum maintenance standards for roads and sidewalks and the development-charge rules. Since late 2025 it bars removing a car lane for a bike lane unless a regulation allows it, and it has ended municipal speed cameras. O. Reg. 239/02, Minimum Maintenance Standards for Municipal Highways (e-Laws, archived August 13, 2026) ↗Highway Traffic Act (e-Laws, consolidated from July 1, 2026, archived October 26, 2026) ↗Development Charges Act, 1997 (e-Laws, consolidated from June 2, 2026, archived) ↗

    OPTIONS6. Bike lanes and complete streets, 7. Speed limits, traffic calming and street safety

  2. The plan

    WHO DECIDESCity council

    Council approved the Mobility Master Plan on July 22, 2025, 10 to 2. Its costs are initial estimates, subject to approval through future budgets. Council minutes, July 22, 2025 (PDF) ↗Mobility Master Plan, pp. 106-107 (PDF) ↗

    OPTION6. Bike lanes and complete streets

  3. The study

    WHO DECIDESCity staff run it; council can suspend or restart it

    Council suspended the Wonderland Road environmental assessment in September 2021 and voted 9 to 6 on April 1, 2025 to restart it. Council minutes, April 1, 2025 ↗

    OPTIONS1. Wonderland Road: six general lanes or rapid-transit lanes, 2. A ring road with neighbouring municipalities and the Province

  4. The money

    WHO DECIDESCity council sets the capital budget; growth pays a share through development charges

    Transportation Services is $768.3 million of the 2024-2027 capital plan. The roads development-charge fund paid out $72.9 million in 2025 and took in $31.3 million. 2026 Annual Budget Update, pp. 90-91 (PDF) ↗2025 Annual Report on Development Charges Reserve Funds (ICSC, May 27, 2026), Appendix A (PDF) ↗

    OPTIONS3. Widen and extend arterial roads in growth areas, 4. Wharncliffe Road South: the rail underpass and the Oxford intersection

  5. The contract

    WHO DECIDESCity council awards the tender

    Council awarded the Highbury Avenue South contract on March 31, 2026 at $25,455,593.35 before HST, the lowest of four bids, 13 to 1, and the Wellington Gateway Phase 2B contract on June 23, 2026 at $50,416,071.33, 13 to 1. Council minutes, March 31, 2026 ↗Council minutes, June 23, 2026 ↗

    OPTION5. How the rapid transit lines under construction are built

  6. The build

    WHO DECIDESThe contractor, with a City construction project manager

    Highbury Avenue South Phase 1 started in May 2026. Phase 2 starts in spring 2027, and the City expects construction to end in November 2027. City of London, Highbury Avenue South project page ↗

The Province funds some projects, such as Sunningdale Road West, and council has asked it to take over Highbury Avenue from the Thames River South Branch to the south city limits. No answer was found as of November 4, 2026.

The honest numbers

Where London stands, every figure linked to its source.

Road condition and the repair gap

In the City's last full count (2021), 21.7% of roads were rated Poor or Very Poor. Its 2023 plan says holding that condition takes about $89.6 million a year of road renewal, against about $30.1 million planned. 2023 Corporate Asset Management Plan, Tables 7.10 and 7.16 (PDF) ↗

ROAD RENEWAL A YEAR: NEEDED VERSUS PLANNED ($ MILLIONS): TO SCALE
Roads
$89.6M needed
$30.1M planned
Bridges, culverts and walls
$11.3M needed
$6.7M planned
Signals, lights and signs
$13.8M needed
$8.2M planned

Average a year for 2022 to 2031 in the City's 2023 plan, Table 7.16. Needed is the spending to keep 2021 condition. Planned excludes small reserve-fund amounts ($0.6M roads, $1.5M bridges). 2023 Corporate Asset Management Plan, Table 7.16, p. 166 (PDF) ↗

TEN-YEAR INFRASTRUCTURE GAP, ALL CITY ASSETS: TO SCALE
2014 plan$466.1M
2019 plan$568.8M
2023 plan$946.1M

The gap to keep current service over the next ten years, as each plan stated it. Transportation's part rose from $223.0M (2019 plan) to $677.5M (2023 plan). The City gives inflation and better inventory and condition data as reasons, so the plans are not like for like. 2023 Corporate Asset Management Plan, Tables 22.1 and 23.2 (PDF) ↗

BOTH TRUE AT ONCE
21.7%
of London's roads rated Poor or Very Poor in the City's 2021 count
100%
compliance with the province's minimum maintenance standards the same year

2023 Corporate Asset Management Plan, Table 7.10, p. 156 (PDF) ↗

READ THE NUMBERS (6 POINTS, WITH SOURCES)

The money

Transportation Services, which includes transit and bridges, is $768.3 million (46.7%) of the 2024-2027 capital plan. The City publishes no roads-only total and no roads split by funding source. 2026 Annual Budget Update, pp. 90-91 (PDF) ↗

READ THE NUMBERS (5 POINTS, WITH SOURCES)
  • Capital plan
  • Transportation Services is $768.3 million of the $1,643.6 million (46.7%) in the 2024-2027 capital plan, and $1,920.0 million of $3,587.6 million (53.5%) in the 2024-2033 plan. Transportation Services includes transit and bridges. The City publishes no roads-only total and no split by funding source. City of London: 2026 Annual Budget Update, adopted (PDF), pp. 90-91 ↗
  • How the plan is paid
  • The whole 2024-2027 capital plan is paid $1,045.7 million from tax-supported sources (capital levy $269.5 million, debt $334.2 million, reserve funds $442.0 million) and $597.9 million from other sources, including $72.5 million of federal Canada Community-Building Fund money (now the Build Communities Strong Fund's Community stream) and $75.4 million of provincial grants. 2026 Annual Budget Update, adopted, p. 92 (PDF) ↗Housing, Infrastructure and Communities Canada, Build Communities Strong Fund, Community stream ↗
  • Ottawa's Budget 2026, tabled November 5, 2026, expects Build Communities Strong Fund Community Stream payments across Canada to grow from $2.5 billion in 2026-27 to $2.8 billion in 2030-31. The payments go up 2% a year, with each increase added in steps of $100 million. The budget does not give London's share. A budget measure is a proposal until Parliament passes it. Budget 2026, annex 1 (Nov. 5, 2026) ↗
  • Day-to-day upkeep
  • The Roadways operating budget, which covers maintenance, winter work and road planning, is $71.5 million in 2026 ($58.6 million from the tax levy) and $72.9 million in 2027 ($59.8 million from the levy), up from $58.2 million in 2023. The City's table does not split out winter maintenance. 2026 Annual Budget Update, adopted, p. 85 (PDF) ↗
  • Highbury Avenue South
  • One request would move a road off the City's books. On March 31, 2026 council voted 14 to 0 to endorse asking the Province to take over Highbury Avenue from the Thames River South Branch to the south city limits; every member present voted Yea, and Pribil was absent. CTV London's April 1, 2026 headline says the effort is close, and no provincial answer was found as of November 4, 2026. Council minutes, March 31, 2026 ↗CTV London, April 1, 2026 ↗

Who pays for growth roads: development charges

Roads are $25,150 of the $50,564 charge on a new detached home in 2026. In 2025 the roads development-charge fund paid out $72.9 million, $66.9 million of it debt payments, and took in $31.3 million. 2025 Annual Report on Development Charges Reserve Funds (ICSC, May 27, 2026), Appendix A (PDF) ↗City of London, 2026 development charges brochure (PDF) ↗

READ THE NUMBERS (5 POINTS, WITH SOURCES)

Winter maintenance

London clears roads on the province's minimum timetable, from 4 hours after a snowfall on the busiest roads to 24 hours on local streets. Sidewalks are cleared within 48 hours. City of London, Winter maintenance (modified February 7, 2025) ↗O. Reg. 239/02, Minimum Maintenance Standards for Municipal Highways (e-Laws, archived August 13, 2026) ↗

WINTER ROADS BUDGET VERSUS ACTUAL SPENDING ($ MILLIONS): TO SCALE
2020
$15.6M budget
$14.7M spent
2021
$16.6M budget
$15.1M spent
2022
$17.0M budget
$19.7M spent
2023
$17.6M budget
$16.3M spent
2024
$18.8M budget
$18.1M spent
2025
$19.1M budget
$21.1M projected

By budget year. The 2025 spending figure was a projection in August 2025. The budget has grown mostly because the road network has grown, the review says. Winter Maintenance Review, August 13, 2025, section 2.1.5.1 table (PDF) ↗

READ THE NUMBERS (7 POINTS, WITH SOURCES)
  • Service levels
  • The City's winter page sets clearing times after snow stops: Class 1 roads such as Highbury Avenue and Wellington Road, 4 hours; Class 2 roads such as Oxford Street and Dundas Street, 6 hours; Class 3, 12 hours; Class 4, 16 hours; local streets, 24 hours once 10 cm has fallen. Bike lanes follow within 8 to 24 hours and sidewalks within 48 hours. City of London, Winter maintenance (modified February 7, 2025) ↗
  • Those road times equal Ontario's Minimum Maintenance Standards (O. Reg. 239/02), which set a legal floor and the City's legal defence when sued over road upkeep. The regulation sets minimums; London Decides' reading is that nothing in it stops a council setting faster times or lower snow depths. O. Reg. 239/02, Minimum Maintenance Standards for Municipal Highways (e-Laws, archived August 13, 2026) ↗
  • The sidewalk standard
  • The City's page says sidewalks are cleared after 8 cm of snow, and also that this "will be improved to five centimetres" in fall 2021; the page gives both. Global News reported in January 2023 that London moved to 5 cm in 2021 and that staff proposed returning to the provincial standard to save about $740,000. The City's August 2025 review says the extra $740,000 for the higher sidewalk standard ran in the 2021 to 2023 budget years and was reversed in 2024. City of London, Winter maintenance (modified February 7, 2025) ↗Global News, January 25, 2023 ↗Winter Maintenance Review, August 13, 2025, section 2.1.5.1 (PDF) ↗
  • On January 26, 2023 the Strategic Priorities and Policy Committee, sitting on the budget, voted 5 to 9 on reducing the added winter maintenance money by $740,000 (business case P-10c), so the money stayed. Yea: Cuddy, Hopkins, Lehman, Lewis, Stevenson. Nay: Ferreira, Franke, McAlister, Morgan, Peloza, Pribil, Rahman, Trosow, Van Meerbergen. Absent: Hillier. Strategic Priorities and Policy Committee (budget) minutes, January 26, 2023 ↗
  • The 2025 review
  • On April 22, 2025 council asked staff to review winter performance. Part a), a report on changes to the provincial standards and their effect on City operations, passed 10 to 5. Yea: Ferreira, Franke, Hillier, Hopkins, Lehman, McAlister, Pribil, Rahman, Trosow, Van Meerbergen. Nay: Cuddy, Lewis, Morgan, Peloza, Stevenson. Part b), a review of the 2024/25 winter including contractors, the cost of machines that clear windrows at driveways, and options for roads, laneways and sidewalks, passed 12 to 3. Yea: Ferreira, Franke, Hopkins, Lehman, McAlister, Morgan, Peloza, Pribil, Rahman, Stevenson, Trosow, Van Meerbergen. Nay: Cuddy, Hillier, Lewis. Council minutes, April 22, 2025 ↗
  • The committee received the review on August 13, 2025 with no recorded vote. It puts the winter roads budget at $19.1 million and says the 2024/25 winter had the second-highest snow accumulation in 30 years: 121 winter events and 16 full deployments, against 43 events and 5 full deployments the winter before. Its table shows spending over budget in 2022 by $2.7 million and in 2025 by a projected $2.0 million, and under budget in the other four years from 2020. Winter Maintenance Review, report to the Infrastructure and Corporate Services Committee, August 13, 2025 (PDF) ↗Infrastructure and Corporate Services Committee minutes, August 13, 2025 ↗
  • What more service would cost
  • The review costs three additions. Clearing driveway windrows for about 1,000 homes of people who are 65 or older or have a physical disability, as several cities do for a fee: $450,000 to $550,000 a year. Clearing windrows for every home on Toronto's Scarborough model: $9 million to $11 million a year. De-icing sidewalks with persistent ice pack: $1.2 million to $1.4 million a year. Staff did not recommend the added-cost options, citing the Mayor's direction to reduce the expected tax increase. No windrow program and no 2026 change to service levels was found. Winter Maintenance Review, report to the Infrastructure and Corporate Services Committee, August 13, 2025 (PDF) ↗

Road safety, collisions and the end of speed cameras

London Police counted about 13,354 collisions and 12 road deaths in 2024. Ontario ended municipal speed cameras on November 14, 2025, and London's seven school-zone cameras came down. London Police Service, Traffic and road safety ↗City of London, Road safety (modified April 7, 2026) ↗

ROAD LENGTH BY POSTED SPEED LIMIT (DERIVED): TO SCALE
20-30 km/h1.1 km
40 km/h1,250.7 km (67.8%)
50 km/h185.1 km (10.0%)
60 km/h156.4 km (8.5%)
70 km/h43.4 km (2.4%)
80 km/h187.9 km (10.2%)
90-100 km/h19.9 km (1.1%)

Centreline kilometres by posted limit, derived by London Decides from the City's open Speed Limits layer (newest edit August 28, 2025). The City calls the layer unofficial; the Traffic and Parking By-law is the legal source. The 80 to 100 km/h roads are mostly rural roads inside city limits (inference). City of London open data, Speed Limits layer ↗

READ THE NUMBERS (8 POINTS, WITH SOURCES)

What the City's own pages say about Wonderland Road

The City's 2026 budget records council's April 2025 restart of the Wonderland Road study. Its two web pages still list the study as suspended, on hold and complete. 2026 Annual Budget Update, adopted, p. 150 (PDF) ↗City of London, Wonderland Road Environmental Assessment ↗City of London, Environmental assessments ↗

READ THE NUMBERS (2 POINTS, WITH SOURCES)
  • The City's Wonderland Road project page, last updated August 5, 2025, lists the environmental assessment as suspended. The environmental assessment index lists the study as on hold, with detailed design in 2031 and construction in 2033, and also lists the assessment as complete. Both pages read the same on November 4, 2026. City of London, Wonderland Road Environmental Assessment ↗City of London, Environmental assessments ↗
  • The 2026 budget update, adopted November 26, 2025, says council directed staff in April 2025 to restart the study with limits to Fanshawe Park Road. It keeps $2.05 million for the study in 2024 to 2027 and moves construction money to 2028 and later. No consultant award or study notice for the restarted study was found. 2026 Annual Budget Update, adopted, p. 150 (PDF) ↗

The option space

What cities try for this. Evidence for, evidence against, costs, and who decides, for every option, identically. The site does not pick one. That's council's job, and yours to weigh in on.

OPTION 1 OF 7

Wonderland Road: six general lanes or rapid-transit lanes

Decide what Wonderland Road becomes between Southdale Road and Fanshawe Park Road. Council suspended the environmental assessment for six lanes on September 14, 2021, 9 to 5, noting that the corridor's role would be considered in the Mobility Master Plan. On April 1, 2025 it voted 9 to 6 to restart the study for six general-purpose lanes with a long-term option to convert to rapid transit, and to use the widening's cost in the 2028 development-charge study. Yea: Cuddy, Hillier, Lehman, Lewis, Morgan, Pribil, Rahman, Stevenson, Van Meerbergen. Nay: Ferreira, Franke, Hopkins, McAlister, Peloza, Trosow. Staff had recommended bus-only rapid-transit lanes. The City's 2026 budget records the restart; its project pages still list the study as suspended or on hold.

■ CITY DECIDES□ COST NOT DERIVABLE
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
AT LONDON'S SCALE: NOT DERIVABLE FROM PUBLIC DATA

The last published cost for the whole widening is about $212 million in 2021, for six lanes from Southdale Road to Sarnia Road. The 2026 budget update keeps $2.05 million for the study in 2024 to 2027, moves $30.5 million of construction money out of that period, and shows $108.7 million in 2028 to 2033. It gives no cost for the six-lane scope to Fanshawe Park Road and no split between development charges and the tax levy. 2026 Annual Budget Update, adopted, pp. 150-152 (PDF) ↗CBC News, September 15, 2021 ↗

■ CITY DECIDESCouncil directs the study, the capital budget and the 2028 development-charge study. The Province approves the road only through the environmental assessment process, and no provincial or federal money has been announced.
OPTION 2 OF 7

A ring road with neighbouring municipalities and the Province

Decide whether to keep pursuing a ring road around London with neighbouring municipalities and the Province. On April 1, 2025 council voted 12 to 3 to ask the Mayor and staff to discuss with them a ring road and an integrated transportation network. Yea: Cuddy, Ferreira, Hillier, Hopkins, Lehman, Lewis, McAlister, Morgan, Pribil, Rahman, Stevenson, Van Meerbergen. Nay: Franke, Peloza, Trosow. The Mobility Master Plan carries the same direction. No route, cost, schedule or report on the talks had been published as of November 4, 2026, and the Mayor told council the motion names no locations or connections.

□ SHARED: CITY + PROVINCE□ COST NOT DERIVABLE
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
AT LONDON'S SCALE: NOT DERIVABLE FROM PUBLIC DATA

No route or cost exists. The only figure in a City document is the 2001 study's estimate of about $500 million, which the March 25, 2025 staff report says would be higher today. A London-scale cost is not derivable until a route is drawn. City staff report to the Strategic Priorities and Policy Committee, March 25, 2025, section 2.3.3 (PDF) ↗

□ SHARED: CITY + PROVINCEThe Province would decide whether any provincial highway is built, and neighbouring municipalities control land outside London. Council decides whether to keep pursuing the talks and what it asks for.
OPTION 3 OF 7

Widen and extend arterial roads in growth areas

Decide which arterial roads serving new neighbourhoods are widened or extended, and when. The City's pages list Sunningdale Road West (two to four lanes, Wonderland Road to Villagewalk Boulevard, 2026 to 2028), Southdale Road West (construction spring 2027), Bostwick Road (spring 2028), Oxford Street West (Westdel Bourne to Commissioners Road, 2027) and the Bradley Avenue Extension. Council's yearly growth-infrastructure updates moved Bradley Avenue from Wonderland Road to Bostwick Road from 2028 to 2033 on July 22, 2025, and to 2035 on July 21, 2026, with no recorded roll call. The minutes show routine steps for these roads and no recorded vote on widening itself.

■ CITY DECIDES□ COST NOT DERIVABLE
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
AT LONDON'S SCALE: NOT DERIVABLE FROM PUBLIC DATA

No total cost is published for Sunningdale, Southdale, Bostwick, Oxford West or Bradley West. The 2026 budget update moved $33.7 million of Sunningdale Road work from 2026 to 2027. At the end of 2025 the City had $231.5 million of road debt to be repaid from future development charges authorized but not yet issued. 2026 Annual Budget Update, adopted, p. 153 (PDF) ↗2025 Annual Report on Development Charges Reserve Funds (ICSC, May 27, 2026), Appendix A (PDF) ↗Council minutes, July 21, 2026 ↗

■ CITY DECIDESCouncil sets timing through the yearly growth-infrastructure plan, the capital budget and the 2028 development-charge study. The Province funds some projects, such as Sunningdale Road West.
OPTION 4 OF 7

Wharncliffe Road South: the rail underpass and the Oxford intersection

Decide when to fund two Wharncliffe Road projects. The Wharncliffe Road South improvements add a northbound lane from Horton Street to Becher Street and replace the CN rail bridge north of Horton. The 2024-2027 budget listed a $39.6 million cost increase for this grade separation as business case P-54, marked Not Approved, and the City's page says construction timing depends on future budgets. Separately, in January 2024 council asked the Province to move $6.5 million of federal-provincial infrastructure money from the Oxford Street and Wharncliffe Road intersection to the Wellington Gateway rapid transit line. Committee voted 13 to 1 on January 16. Yea: Cuddy, Ferreira, Franke, Hillier, Hopkins, Lewis, McAlister, Morgan, Peloza, Pribil, Rahman, Stevenson, Trosow. Nay: Van Meerbergen. Absent: Lehman. Council voted 9 to 6 on January 23. Yea: Ferreira, Franke, Hillier, Hopkins, McAlister, Morgan, Peloza, Rahman, Trosow. Nay: Cuddy, Lehman, Lewis, Pribil, Stevenson, Van Meerbergen.

■ CITY DECIDES■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
  • The increase would have meant $12.5 million of borrowing, $21.1 million from development charges and $5.9 million from CN Rail, adding $1.58 million a year to the tax levy for debt payments from 2026. 2024-2027 Multi-Year Budget, business case P-54 (PDF, archived copy) ↗
  • The Mayor's January 2024 budget did not include it. He told CTV the delay would be about 18 to 24 months, with the CN Rail agreement to be finished in time for the funding decision. CTV London, July 25, 2024 (archived) ↗
  • On the intersection, Mayor Morgan told Global News in January 2024 that moving the $6.5 million took pressure off the tax base, since the City would otherwise borrow for rapid transit cost overruns. About $12 million stayed with the intersection. Global News, January 17, 2024 ↗
AT LONDON'S SCALE: ARITHMETIC SHOWN

The underpass's budget to 2023 was $51.0 million; with the $39.6 million increase the total would be about $90.6 million (derived from the business case). The 2026 budget update lists the Wharncliffe Road-Becher Street underpass among its significant project deferrals. 2024-2027 Multi-Year Budget, business case P-54 (PDF, archived copy) ↗2026 Annual Budget Update, adopted, p. 112 (PDF) ↗

■ CITY DECIDESCouncil decides the funding in the 2028-2031 multi-year budget and the growth share in the 2028 development-charge study. CN Rail's share and schedule are set by agreement, which was not final in anything found.
OPTION 5 OF 7

How the rapid transit lines under construction are built

Decide how the rapid transit lines already under construction are staged: work hours, how many streets close at once, access for businesses, and what the City offers shops that lose customers. Wellington Gateway Phase 2B started August 31, 2026 and runs through 2029, with restoration into 2030. East London Link Phase 5 has closed Dundas Street between McCormick Boulevard and Highbury Avenue since March 16, 2026, with work through 2027, final asphalt in 2028 and no reopening date. The project page says fully closed to traffic, while the City's March 2026 presentation says reduced lanes. Whether to build the north and west lines is in the Transit file.

■ CITY DECIDES□ COST NOT DERIVABLE
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
  • CBC reported on April 1, 2026 that Wellington Road business owners described falls in customers. The City's construction director said the Municipal Act gives the City no mechanism to compensate business losses, and that the City has two business relations coordinators. CBC News, April 1, 2026 ↗
  • The rapid transit work runs at the same time as the City's 2026 Renew program, about $285 million in new projects across more than 100 lane-kilometres of road and 20 intersections. City of London, 2026 Renew construction program ↗
EVIDENCE AGAINST / LIMITS
AT LONDON'S SCALE: NOT DERIVABLE FROM PUBLIC DATA

Council approved Phase 2B on June 23, 2026 at $50,416,071.33 for construction, the lowest of four bids, plus $4,802,873.13 for inspection, 13 to 1. Yea: Cuddy, Ferreira, Franke, Hillier, Hopkins, Lehman, Lewis, McAlister, Morgan, Peloza, Pribil, Rahman, Trosow. Nay: Stevenson. Absent: Van Meerbergen. The cost of a compensation program or longer work hours is not derivable from published figures. Council minutes, June 23, 2026 ↗City of London, Wellington Gateway enters final phase, August 28, 2026 ↗Get Involved London, East London Link ↗East London Link Phase 5 pre-construction presentation, March 2026 (PDF) ↗

■ CITY DECIDESCouncil sets contract terms and the construction program; a compensation program would need a new City policy within provincial law. Staff and contractors set the staging. Senior governments fund part of the lines but do not set the schedule.
OPTION 6 OF 7

Bike lanes and complete streets

Decide how much of the Mobility Master Plan's cycling network is built, where, and in what order. Council approved the plan on July 22, 2025, 10 to 2, with a target of at least 32.5% of trips by walking, cycling and transit by 2050, up from 23% in 2019. Yea: Ferreira, Franke, Hopkins, Lehman, Lewis, McAlister, Morgan, Pribil, Rahman, Trosow. Nay: Stevenson, Van Meerbergen. Absent: Cuddy, Hillier, Peloza. On April 1, 2025 council removed seven proposed additions from the cycling maps in five votes and kept Huron Street as a medium-term project. Since November 27, 2025, Ontario law bars any municipality from removing a car lane to add a bike lane unless a provincial regulation allows it. Council still decides lanes that keep every car lane.

□ SHARED: CITY + PROVINCE■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
AT LONDON'S SCALE: ARITHMETIC SHOWN

Cycling is $170 million to $190 million of the plan's roughly $2.84 billion to $3.06 billion in capital estimates to 2050, about 6% (derived), in 2025 dollars and before operating costs. Roads are $2.1 billion to $2.2 billion. Mobility Master Plan, Exhibit 5.1, p. 107 (PDF) ↗

□ SHARED: CITY + PROVINCECouncil approves the routes, their order and their money in the multi-year budget. The Province decides, by regulation under the Highway Traffic Act, whether a lane that removes a car lane may go ahead, and may order reviews of existing lanes in municipalities it names. No regulation naming London was found.
OPTION 7 OF 7

Speed limits, traffic calming and street safety

Decide how London slows traffic with the tools council still controls: speed limits, traffic calming, roundabouts and the Safe Mobility Action Plan. Speed cameras are now the Province's call, not council's. Bill 56 repealed automated speed enforcement on November 14, 2025, and London's seven school-zone cameras came down, after council voted 15 to 0 to ask the Province to strengthen the program instead. Red-light cameras remain legal. Council voted 5 to 9 in July 2024 on lowering school-zone speed limits on major streets, and 8 to 7 in November 2025 on funding school-zone calming from the camera reserve for 2026 and 2027; the roll calls are in the road safety card above. The City is drafting a Safe Mobility Action Plan in winter 2027, with no council date set.

□ SHARED: CITY + PROVINCE■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
AT LONDON'S SCALE: ARITHMETIC SHOWN

School-zone calming is $155,000 operating and $100,000 capital in each of 2026 and 2027. The provincial Road Safety Initiatives Fund gave London an initial $1.29 million after the cameras ended. On the City's open speed-limit data, about 68% of London's road length is posted at 40 km/h (derived, August 2025 data). Budget Committee minutes, November 20, 2025 ↗City of London, Road safety (modified April 7, 2026) ↗City of London open data, Speed Limits layer ↗

□ SHARED: CITY + PROVINCECouncil sets speed limits on City roads by by-law, runs the calming program and approves the Safe Mobility Action Plan and its budget. The Province ended speed cameras, sets red-light camera rules and runs the Road Safety Initiatives Fund. Police enforce speed limits.

What the new council decides, and when

Events on the calendar, not outcomes. Dates the City has not set are marked as such.

  1. January 1, 2027
    PROVINCE OF ONTARIO

    Highway Traffic Act s. 206.5 takes effect: camera contracts, including red-light camera contracts, may no longer pay a vendor per ticket or as a share of revenue. Highway Traffic Act (e-Laws, consolidated from July 1, 2026, archived October 26, 2026) ↗

    OPTION7. Speed limits, traffic calming and street safety

  2. By February 1, 2027
    MAYOR, THEN CITY COUNCIL

    The Mayor must table the 2027 budget update, the last year of the 2024-2027 multi-year budget. Council then has up to 30 days to amend it. 2026 Annual Budget Update, p. 23 (PDF) ↗

  3. First quarter of 2027
    STRATEGIC PRIORITIES AND POLICY COMMITTEE

    The 2028 development charge background study and by-law, which set what growth pays toward roads, are tabled. Get Involved London, 2028 Development Charge Study ↗

    OPTION3. Widen and extend arterial roads in growth areas

  4. Winter 2027
    CITY STAFF

    The Safe Mobility Action Plan, which replaces the 2014 road safety strategy, is scheduled to be drafted. A date for council approval has not been set. Get Involved London, Safe Mobility Action Plan ↗

    OPTION7. Speed limits, traffic calming and street safety

  5. Spring 2027
    CITY OF LONDON (CONSTRUCTION SCHEDULE)

    Highbury Avenue South Phase 2 starts, from south of Commissioners Road East to Highway 401, including the Bradley Avenue underpass. City of London, Highbury Avenue South project page ↗

  6. Second quarter of 2027
    STRATEGIC PRIORITIES AND POLICY COMMITTEE

    The deliberations report on the 2028 development charge background study comes to committee. Get Involved London, 2028 Development Charge Study ↗

    OPTION3. Widen and extend arterial roads in growth areas

  7. By July 1, 2027
    CITY COUNCIL

    Council's yearly review of progress on the asset management plan, which sets road and bridge condition targets, is due under Ontario's asset management rules. O. Reg. 588/17, Asset Management Planning (e-Laws, archived July 15, 2026) ↗

  8. End of 2027
    CITY COUNCIL (BUDGET)

    Funding for school-zone traffic calming and temporary calming on construction detours from the Automated Enforcement Reserve Fund runs through 2027 only. Budget Committee minutes, November 20, 2025 ↗

    OPTION7. Speed limits, traffic calming and street safety

  9. January 1, 2028 (target)
    CITY COUNCIL

    The 2028 development charge by-law is targeted to take effect. Get Involved London, 2028 Development Charge Study ↗

    OPTION3. Widen and extend arterial roads in growth areas

  10. 2028
    CITY OF LONDON (CONSTRUCTION SCHEDULE)

    Final surface asphalt on Dundas Street for East London Link Phase 5. The City has published no date for reopening Dundas to through traffic. Get Involved London, East London Link ↗

    OPTION5. How the rapid transit lines under construction are built

  11. 2028-2031 budget (date not yet set)
    MAYOR, THEN CITY COUNCIL

    The next multi-year budget, which CTV London reported is where the Wharncliffe Road grade separation's $39.6 million cost increase will be decided. CTV London, July 25, 2024 (archived) ↗

    OPTION4. Wharncliffe Road South: the rail underpass and the Oxford intersection

  12. 2028-2031 budget (date not yet set)
    MAYOR, THEN CITY COUNCIL

    The next multi-year budget, where the Mobility Master Plan says its road, transit and cycling projects get detailed phasing and funding. Mobility Master Plan, p. 107 (PDF) ↗

    OPTION6. Bike lanes and complete streets

Roads and repairs

Road work that is under way or under contract now.

■ CITY DECIDES

Highbury Avenue South rebuild, 2026 and 2027

The City is rebuilding Highbury Avenue South from the Thames River to Highway 401, and most of that corridor is in Ward 14. Phase 1 started in May 2026 and runs from the Thames River bridge to just south of Commissioners Road East. Phase 2, from there to Highway 401 including the Bradley Avenue underpass, starts in spring 2027, and the City expects construction to end in November 2027. Traffic stays at one lane each way, with signed ramp detours. On March 31, 2026, council awarded the construction contract at $25,455,593.35 before HST, the lowest of four bids, by a vote of 13 to 1 (Nay: Hillier; absent: Pribil; every other member Yea). The same day, council voted 14 to 0 to endorse transferring responsibility for Highbury Avenue from the Thames River South Branch to the south city limits to the Province of Ontario and to forward that resolution to the Ministry of Transportation; every member present voted Yea, and Pribil was absent. No provincial response had been found as of November 4, 2026.

The honest numbers ▾

The City's project page says Phase 1 started in May 2026, and that Phase 2 starts in spring 2027 with construction expected to end in November 2027, with one lane each way and signed ramp detours. The council minutes of March 31, 2026, item 2.13, record that the construction contract (tender RFT-2025-270) was awarded at $25,455,593.35 excluding HST, the lowest of four bids, 13 to 1; the amendment endorsing the transfer of Highbury Avenue to the Province passed 14 to 0. City of London, Highbury Avenue South project page ↗City of London, Council minutes, March 31, 2026 ↗

Ask your councillor

What should the City tell residents and businesses about detours and timing before Phase 2 starts in spring 2027, and what should council do next on its request that the Province take over the road?

Wards 1 and 14

■ CITY DECIDES

2026 Renew construction program

The City's 2026 Renew program covers roadwork, intersections and underground work citywide.

The honest numbers ▾

About $285 million in new projects plus about $100 million in ongoing work from last year, covering more than 100 lane-kilometres of road, 20 intersections and more than 30 km of new or replaced underground pipes. City of London ↗

Ask your councillor

Which road and sidewalk projects are planned in each ward for 2026 and 2027, and when will council see the list?

■ CITY DECIDES

Kilally Road reconstruction and the Highbury towers appeal

The Kilally Infrastructure Project is rebuilding Kilally Road from Webster Street to Clarke Road. The City's project page gives two dates. Its timeline lists Kilally Road, Webster Street to Clarke Road, for completion in December 2026. Its questions section says the road stays closed until mid-December 2026, reopens for the winter, and work resumes in spring 2027, with completion expected in early to mid-summer 2027. Final paving and landscaping are listed for 2027. The JW Carson Bridge closure on Clarke Road was scheduled for July 13 to August 14, 2026. According to the City's ward data, Kilally Road addresses in the project area are in Ward 3 under the boundaries that start November 15, 2026, while some addresses west of Highbury Avenue move to Ward 4. Nearby, 1470-1474 Highbury Avenue North (three 14-storey apartment buildings) stays in Ward 3. On September 9, 2025, the Planning and Environment Committee voted 5 to 0 to refuse the zoning change, on staff's recommendation. Reasons in the record include groundwater, the timing of a hydrogeological study, compatibility and setback from a high-pressure pipeline. The developer appealed, and the Ontario Land Tribunal has set a 10-day hearing for February 1 to 12, 2027.

The honest numbers ▾

The City's project page gives two dates. Its timeline lists Kilally Road, Webster Street to Clarke Road, for completion in December 2026. Its questions section says the road stays closed until mid-December 2026, reopens for the winter, and work resumes in spring 2027, with completion expected in early to mid-summer 2027. City of London (Get Involved) ↗Ontario Land Tribunal, OLT-25-000816, decision and procedural order, May 20, 2026 (PDF) ↗

Ask your councillor

How should council and staff coordinate with Ward 4 on Kilally Road and Highbury Avenue, and what should council be told about the City's position at the 2027 tribunal hearing?

Wards 3 and 4

□ SHARED: CITY + PROVINCE

Sunningdale Road: two projects under way

Sunningdale Road West is being widened from two lanes to four between Wonderland Road and Villagewalk Boulevard, with sidewalks, cycle tracks and a new Medway Creek bridge. Phase 1 (Wonderland to Medway Creek) is in 2026, with bridge work into 2027. Phase 2 (Medway Creek to Villagewalk) is planned for 2027 to 2028. Separately, the Sunningdale and Richmond intersection rebuild started in May 2025, and the City lists it as finishing in August or fall 2026.

The honest numbers ▾

The Province committed more than $18 million to the Wonderland to Villagewalk widening, announced August 14, 2025. The City's release does not give a total project cost. On October 5, 2026 a council committee recommended raising the Sunningdale and Richmond intersection contract by $700,000, to $8,586,917.50 before HST. It went to council on October 14, 2026, and those minutes were not posted as of November 4, 2026. City of London ↗Infrastructure and Corporate Services Committee minutes, October 5, 2026, item 2.8 ↗

Ask your councillor

What is the schedule for finishing both Sunningdale projects, and what traffic arrangements are planned while they overlap?

Wards 5 and 7

■ CITY DECIDES

Colonel Talbot Road upgrade: final stage in 2026

The City is turning Colonel Talbot Road from a two-lane rural road with ditches and gravel shoulders into a two-lane urban road connecting Talbot Village and Lambeth. It will have sidewalks, multi-use pathways and boulevard bike paths. The City lists the third stage as 2026, covering surface asphalt, restoration, landscaping and clean-up of deficiencies.

The honest numbers ▾

The City's notice for overnight paving on June 1 and 2, 2026 said underground servicing and drainage were complete. The project page gives 2026 for the final stage and no completion date. No City update after June was found as of October 28, 2026. City of London – Colonel Talbot Road project enters final paving stage ↗

Ask your councillor

When will the Colonel Talbot Road upgrade be finished, and how will residents report problems found after the work ends?

Ward 9

■ CITY DECIDES

Bradley Avenue Extension construction

The Bradley Avenue Extension is being built near the Wellington Road transit work. It has two parts. One is a new four-lane road from Wharncliffe Road South to White Oak Road. The other widens existing Bradley Avenue from two lanes to four between White Oak Road and Jalna Boulevard. The west end at Wharncliffe Road South touches Ward 10, and the rest of the work is in Ward 12.

The honest numbers ▾

The City says work began in June 2025 and is expected to be mostly finished by fall 2026. Landscaping and the final asphalt layer are scheduled for spring 2027. The City's page shows no update date. The finished road is to be a four-lane street with sidewalks, in-boulevard bike lanes, street lighting and landscaping. On October 5, 2026 a council committee recommended raising the White Oaks Complete Corridor engineering contract with Onterris Canada by $492,370.01, to $1,143,079.34 before HST. City of London - Bradley Avenue Extension ↗Infrastructure and Corporate Services Committee minutes, October 5, 2026, item 2.5 ↗

Ask your councillor

What should the City do to keep access to homes and businesses open while Bradley Avenue and Wellington Road work overlap?

Wards 10 and 12

■ CITY DECIDES

The Queen's Bridge rehabilitation and future rapid transit

The Downtown Loop (bus-only lanes on King, Wellington, Queens and Ridout) was completed in 2024. Rehabilitation of The Queen's Bridge started March 2, 2026 and is expected to finish by May 2027, in two stages, the north half and then the south half. No stage dates are published. One traffic lane and one sidewalk stay open on Queen's Avenue from Ridout Street North to Wilson Avenue. The City's staff report says replacing the deck is a chance to widen the bridge slightly for a multi-use path on the north side while also accommodating future rapid transit lanes. The contract covers the bridge rehabilitation.

The honest numbers ▾

Council awarded the construction contract to McLean Taylor Construction at $10,218,553.35 excluding HST, the lowest of six bids. With the $1.5-million contingency the figure is $11,718,553.35. A 2025 inspection rated the bridge "poor to fair." The staff report describes one weekend closure for placing the concrete deck, with at least a week's public notice, and no date has been announced. Funding comes from the transportation, rapid transit, traffic and stormwater capital budgets. Contract Award: Tender RFT-2025-258, staff report (PDF) ↗

Ask your councillor

What should council know about cost, timing and route before any decision on the west and north rapid transit legs?

Ward 13

■ CITY DECIDES

Western Road and Sarnia Road/Philip Aziz Avenue, Phase 2

Council's October 14, 2026 agenda included a by-law (Bill 353) to expropriate land for Phase 2 of the Western Road and Sarnia Road/Philip Aziz Avenue corridor and intersection work. On October 5, 2026 a council committee recommended cutting the intersection project's budget by $8.7 million. The October 14 minutes were not posted as of November 4, 2026, so the outcome is not recorded here.

The honest numbers ▾

The expropriation by-law was listed as Bill 353 on the October 14, 2026 council agenda. The Infrastructure and Corporate Services Committee recommended the $8.7 million reduction to the intersection project on October 5, 2026. Council agenda, October 14, 2026 ↗Infrastructure and Corporate Services Committee minutes, October 5, 2026 ↗

Ask your councillor

What should residents near Western and Sarnia be told about the expropriation and the smaller budget, and when should council see a revised schedule?

Ward 6

Cycling

Part of the roads file until it has enough of its own.

■ CITY DECIDES

Cycling routes in the Mobility Master Plan

On April 1, 2025, council removed seven proposed additions from the Mobility Master Plan cycling network maps, in five votes, and kept Huron Street as a medium-term project. On July 22, 2025, council approved the plan 10 to 2. Yea: Ferreira, Franke, Hopkins, Lehman, Lewis, McAlister, Morgan, Pribil, Rahman, Trosow. Nay: Stevenson, Van Meerbergen. Absent: Cuddy, Hillier, Peloza. The plan sets a target for walking, cycling and transit to make up at least 32.5% of trips by 2050. Its capital table puts cycling at $170 million to $190 million of about $2.9 billion, labelled initial estimates subject to council approval through future multi-year budgets. Since November 27, 2025, Ontario law bars removing a car lane to add a bike lane unless a provincial regulation allows it, so council's choices are now about lanes that keep every car lane. The Old North East Neighbourhood Association sent a letter to council about the routes on Huron, Taylor, McNay and Gammage streets.

The honest numbers ▾

The April 1, 2025 votes went as follows. Royal Crescent east of Clarke Road to Wexford Avenue to Admiral Drive, removed 13 to 2; Sovereign Road, 11 to 4; Vancouver Street from Trafalgar Street to Wavell Street, 11 to 4; Taylor, McNay and Gammage streets in one motion, 10 to 5; the Windermere Road to Gainsborough Road active transportation connection, 14 to 1. A motion to remove Huron Street failed 5 to 10, and Huron Street was changed to a medium-term project 14 to 1. The plan’s capital table (2025 dollars, to 2050) lists roads at $2,100 million to $2,200 million, transit $550 million to $650 million, cycling $170 million to $190 million and sidewalks on major roads $20 million, roughly $2.84 billion to $3.06 billion in all. Council minutes, April 1, 2025 ↗Council minutes, July 22, 2025 (PDF) ↗Mobility Master Plan, final (PDF, 144 pp.) ↗Highway Traffic Act (e-Laws, consolidated from July 1, 2026, archived October 26, 2026) ↗

Ask your councillor

Should the next multi-year budget fund the plan’s cycling routes, and if so, which first?

Ward 4

How council voted
  • Jul 22, 2025Council approved the Mobility Master Plan Report and directed staff to file a Notice of Completion and make the report available for the statutory 30-day public review period.Passed 10-2 (3 absent) · Minutes

Road safety

■ CITY DECIDES

Hamilton Road safety, Adelaide Street to Highbury Avenue

On August 27, 2024, council voted 5 to 10 against a motion to direct staff to include an update for Hamilton Road between Adelaide Street and Highbury Avenue in the Mobility Master Plan, which could have included three lanes, protected bike lanes and accessible sidewalks, with any large redesign weighed in the 2028 to 2031 budget. The motion was defeated. Yea: Ferreira, Franke, Hopkins, McAlister, Trosow. Nay: Cuddy, Hillier, Lehman, Lewis, Morgan, Peloza, Pribil, Rahman, Stevenson, Van Meerbergen. Council then voted 15 to 0 to receive the communication on the matter. Council approved the Mobility Master Plan on July 22, 2025, 10 to 2.

The honest numbers ▾

On August 27, 2024, council voted 5 in favour and 10 against directing staff to include a Hamilton Road update in the Mobility Master Plan, so the motion was defeated. Council then voted 15 to 0 to receive the communication. City of London, Council minutes, August 27, 2024 ↗

Ask your councillor

What, if anything, should the City do next on Hamilton Road between Adelaide and Highbury, and when should council see it?

Ward 1

Sidewalks

■ CITY DECIDES

Huron Heights sidewalks and the Connectivity Plan

In November 2023 council approved the Huron Heights Neighbourhood Connectivity Plan, which guides which streets get sidewalks through the City's annual Renew London construction program. The plan also exempts many crescents and courts from the City's sidewalk policy. Most of Huron Heights, including every street named in the plan, is in Ward 3.

The honest numbers ▾

On November 28, 2023 council voted 13 to 2 to approve the plan except the proposed Kaladar Drive, Cayuga Crescent and Mark Street sidewalks. Michael Street, which a committee had excluded, was put back in 15 to 0. Council minutes, November 28, 2023, item 6 clause 3.2 ↗

Ask your councillor

What is your position on the timing of the Connectivity Plan sidewalks and on the streets exempted from sidewalks?

Wards 3 and 4

■ CITY DECIDES

Sidewalk on Hyde Park Road north of Fanshawe Park Road

CBC News reported on July 29, 2026 that the sidewalk on Hyde Park Road just north of Fanshawe Park Road ends, and that people on foot cut through a parking lot to get past the gap. No City record of the gap or a plan to fill it has been located.

The honest numbers ▾

CBC News reported on July 29, 2026 that a short stretch of Hyde Park Road just north of Fanshawe Park Road has no sidewalk, and that people walking south often cut through a store parking lot instead. CBC News, July 29, 2026 ↗

Ask your councillor

Is there a plan to extend the sidewalk on Hyde Park Road north of Fanshawe Park Road, and if so, what are its cost and date?

Ward 7

■ CITY DECIDES

Sidewalk and road renewal in Ward 3

London's Renew program covers roadwork, intersections and underground work citywide. No 2026 list of sidewalk projects for the new Ward 3 was found, so this issue names none.

The honest numbers ▾

The City's 2026 Renew program is about $285 million in new projects plus about $100 million in ongoing work from last year, across all project types. It is not a sidewalk-only figure. City of London ↗

Ask your councillor

Which sidewalk and road projects are planned in Ward 3, and when will council see the list?

Ward 3

What is coming

Decisions that have been made but are not yet built.

■ CITY DECIDES

Wonderland Road: the restarted study for six general lanes

In September 2021 council suspended the Wonderland Road environmental assessment. Climate and environmental concerns were given as the reason. On March 25, 2025 the Strategic Priorities and Policy Committee, and on April 1, 2025 council, voted 9 to 6 to restart it from Southdale Road to Fanshawe Park Road, to build six general-purpose lanes with a long-term option to convert to bus rapid transit. Yea: Cuddy, Hillier, Lehman, Lewis, Morgan, Pribil, Rahman, Stevenson, Van Meerbergen. Nay: Ferreira, Franke, Hopkins, McAlister, Peloza, Trosow. Staff had recommended bus-only rapid-transit lanes. At the same meeting council voted 12 to 3 to ask for talks with neighbouring municipalities and the province about a ring road. Yea: Cuddy, Ferreira, Hillier, Hopkins, Lehman, Lewis, McAlister, Morgan, Pribil, Rahman, Stevenson, Van Meerbergen. Nay: Franke, Peloza, Trosow. The City's 2026 budget update records the restart and keeps $2.05 million for the study. No schedule or cost for the widening has been published, and this page found no route, cost or report for a ring road since. The road touches Wards 5, 6, 7, 8, 10, 11 and 13 (Ward 13 for only about 160 metres).

The honest numbers ▾

In the council minutes of April 1, 2025, part e), restarting the study, passed 9 to 6 (the committee vote on March 25, 2025 was also 9 to 6), and part f) asking for ring-road talks passed 12 to 3. The staff report told council that six general-purpose lanes between Fanshawe Park Road and Southdale Road would leave the 2050 afternoon drive at 23 minutes, against 25 minutes with the rapid-transit lanes staff recommended and 24 minutes today. The motion also directed that the widening’s estimated cost be used in the 2028 development-charges study. CBC News reported on July 29, 2026 that Wonderland Road carries about 48,000 vehicles a day. The City's Wonderland Road Environmental Assessment page, last updated August 5, 2025, lists the Discover Wonderland assessment as suspended since September 2021 and says the road's role will be set in the Mobility Master Plan. Council minutes, April 1, 2025 ↗City of London staff report to Strategic Priorities and Policy Committee, Mar. 25, 2025 (PDF) ↗City of London, Wonderland Road Environmental Assessment ↗CBC News, July 29, 2026 ↗2026 Annual Budget Update, adopted, p. 150 (PDF) ↗

Ask your councillor

What schedule and cost should the City publish for the restarted Wonderland Road study, and what should council weigh between six general lanes and rapid-transit lanes?

Wards 5, 6, 7, 8, 10, 11 and 13

How council voted
  • Apr 1, 2025Council directed staff to restart the Discover Wonderland Road environmental assessment from Southdale Road to Fanshawe Park Road, to build six general-purpose lanes with a long-term option to convert to bus rapid transit, and to use the widening's estimated cost in the 2028 Development Charges Background Study.Passed 9-6. Strategic Priorities and Policy Committee had voted 9-6 on March 25, 2025. · Minutes
■ CITY DECIDES

Hamilton Road at Gore Road: roundabout timing

The City's environmental assessment chose a roundabout for Hamilton Road at Gore Road. The project is in detailed design. The City's two project pages give different construction years. The london.ca page says construction is anticipated in 2027, subject to property acquisition and approvals, though a timeline line on the same page says 2026. The Get Involved London page timeline says tentatively 2028.

The honest numbers ▾

The City's project page (last modified March 27, 2026) says detailed design is underway and construction is anticipated in 2027, subject to property acquisition, approvals and coordination with other projects. City of London (Gore Road and Hamilton Road project page) ↗

Ask your councillor

What construction date should council expect for the Gore Road and Hamilton Road roundabout, and how often should it get an update?

Ward 1

■ CITY DECIDES

Cut-through traffic in Old North: what the City's plan proposes

Residents have raised speeding, cut-through traffic and unsafe walking and cycling conditions in Old North. The City's Central North London Traffic Study covers the area between Richmond Street, Oxford Street, the Thames River and Adelaide Street. Its recommended plan, shown on June 18, 2026, would steer through-traffic onto Cheapside, Colborne and Huron/Regent Streets and larger roads. It uses directional diverters and median islands, first as a pilot with temporary materials. Feedback closed July 22, 2026. The City's project page lists implementation starting in 2028, pending funding and approvals, and does not say whether council approval is needed.

The honest numbers ▾

The comment period closed July 22, 2026. The project page lists study completion for summer 2026 and implementation starting in 2028, pending funding and approvals. As of November 5, 2026 no final report is posted. City of London (Get Involved project page) ↗

Ask your councillor

The City says this plan can go ahead without a council vote. What role, if any, should council have in it, and what would you want the final report to show? (Editor's note, November 5, 2026: the City's project page no longer says whether a council vote is needed. It now lists implementation starting in 2028, pending funding and approvals.)

Ward 6

Where this file meets the Transit, Taxes, Growth and Planning and Safety files

  • The Transit file (/files/transit/) covers whether to build rapid transit north and west, the rapid transit budget, London Transit and the Mobility Master Plan's transit side. This file covers only how the lines under construction are built. Council minutes, July 22, 2025 (PDF) ↗
  • The Taxes file (/files/taxes/) covers the tax levy and the City's whole repair backlog. The Growth and Planning file (/files/growth-and-planning/) covers development-charge rates, discounts and the 2028 by-law. This file uses only the roads figures. Get Involved London, 2028 Development Charge Study ↗
  • The Safety file (/files/safety/) covers policing, including traffic enforcement by police. Speed limits, calming and cameras are here. London Police Service, Traffic and road safety ↗

What to ask your council

Anyone at City Hall can say this issue matters. These are the questions that ask for specifics. Send them to your councillor, or bring them to a committee meeting.

  1. Staff recommended rapid-transit lanes on Wonderland Road and council voted 9 to 6 to restart the study around six general lanes. What should the study compare, and when should council see a cost?
  2. The City's 2023 plan says roads need about $89.6 million a year of renewal and about $30.1 million was planned. In the 2028-2031 budget, would you raise renewal spending, accept a lower road condition, or move money from other projects, and which?
  3. The roads development-charge fund paid out more than twice what it took in during 2025. In the 2028 study, would you add growth roads, delay some, or pay for more from the tax levy?
  4. London clears roads on the province's minimum timetable. Would you keep that, pay for faster clearing or windrow clearing, and what would you trade for it?
  5. Ontario now bars removing a car lane for a bike lane unless a regulation allows it. Would you build the plan's routes only where car lanes stay, ask the Province for exemptions, or change the plan?
  6. School-zone calming is funded from the camera reserve for 2026 and 2027 only. After that, would you fund calming, lower speed limits or roundabouts from the tax levy, rely on the Province's road safety fund, or neither?
  7. The $39.6 million Wharncliffe Road underpass increase was left for the 2028-2031 budget. Would you fund it then, and from what?
CLAIMS THAT COULDN’T BE VERIFIED, SO THEY’RE NOT ON THIS PAGE ▾

These circulate in coverage of this issue but could not be traced to a source that loads and says what’s claimed. The site would rather show you the gap than publish the number.

  • A $400 million cost for widening Wonderland Road. CBC attributed it to staff in April 2025; the March 25, 2025 staff report has no such figure.
  • The 2021 climate screening of the Wonderland widening, reported by CBC. The staff report itself was not read.
  • Road condition, the transportation gap and the full plan update date from the 2025 and 2026 asset management progress reviews. The staff reports could not be opened; only an automated transcript mentions their figures.
  • A yearly series of London collisions, injuries and deaths. London Police publish 2024 only; the City publishes no series.
  • Pothole counts or a London pothole repair target. None is published; the provincial minimums apply.
  • London's yearly allocation from the federal Build Communities Strong Fund Community stream (formerly the Canada Community-Building Fund) and how much goes to roads.
  • Which 2026 and 2027 cycling projects, if any, were redesigned because of the 2025 car-lane rule, and whether the City asked for any exemption.
  • How London is spending its $1.29 million Road Safety Initiatives Fund share, and the Automated Enforcement Reserve Fund balance.
  • How many intersections run red-light cameras in 2026. The City's page dates from December 2024.
  • A provincial answer on taking over Highbury Avenue South, and who said the effort was close in CTV's April 1, 2026 story.
  • Dollar figures for the Dingman Drive widening in the 2025 development-charge reserve report.
  • A $980,000 north rapid transit study figure from a campaign page.
  • The date council adopted the 40 km/h area speed limit policy, and the calming standards for new subdivisions in the October 2025 staff report.