THE HARD FILES · AN OPTIONS BRIEF, NOT A PLAN

The Water File

THE SHORT VERSION

average home bill, 2027 rates report ↗
$1,399
10-year water and sewer capital (derived) 2026 budget ↗
$2.2B
sewage plants with named limits on growth (sources below)
3

This page is a menu of options, not a plan. It walks through the choices the new council faces on water, sewers and stormwater. They are how fast rates rise, whether sewage capacity is built ahead of growth or growth waits for it, lead pipes, overflows to the Thames, how the stormwater charge is set, help for low-income households, and the Province's new water corporation law. For each one it gives the strongest evidence for and against, what it cost where it was tried, and the London-scale math, shown in full or plainly marked as not derivable. It recommends nothing.

One structural fact shapes everything here. Water and sewer run on their own money. The water bill, not the property tax, pays for the pipes, the pumping stations and London's five sewage treatment plants. London doesn't treat its own drinking water. It buys it wholesale from two regional systems, now branded Huron Erie Water, and holds a built-in majority on the Lake Huron board. So the levers in this file are the rate, the capital plan and the City's seats on those boards.

Research was completed November 3, 2026. Every claim links to a source, and figures we worked out ourselves are marked as derived. The council that takes office November 15, 2026 decides these questions, starting with the 2027 budget update.

READ EVERY NUMBER HERE WITH THIS

The City's average home bill for water, sewer and stormwater, $1,333 in 2026 and $1,399 in 2027 at 200 m³ a year, is the number every option here is measured against.

The options at a glance

Each option gets the same three things: its name, who decides it, and one London number. They're listed in the order the research found them, not ranked.

  1. Steady full-cost rates, or smoothed increases
    ■ CITY DECIDES1 point on water is about $5.70 a year for the average home (derived)
  2. Build sewage capacity first, or pace approvals to it
    □ SHARED: CITY + PROVINCE$418 million of wastewater growth capital, 2024 to 2033
  3. Replace lead service pipes faster
    ■ CITY DECIDESAbout 3,700 public-side lead services may remain (derived)
  4. Cut sewage overflows to the Thames faster
    □ SHARED: CITY + PROVINCE11.69 km of combined sewer left
  5. Charge stormwater by hard surface
    ■ CITY DECIDES$249 a year stormwater charge on the average home
  6. Ongoing bill help for low-income households
    ■ CITY DECIDES$100,000 a year crisis fund today
  7. Move water into a public corporation
    □ PROVINCE DECIDESThe boards' legal advice: the Act doesn't apply to London as written

Where your water goes, and who decides each step

  1. The lakes

    WHO DECIDESSource water for the regional systems

    About 85% of London's water comes from Lake Huron and 15% from Lake Erie. Water Service Area Financial Plan, Oct 2024 (PDF) ↗

  2. Regional treatment plants

    WHO DECIDESHuron Erie Water boards (London holds 16 of 27 votes on the Lake Huron board)

    The Ontario Clean Water Agency runs both plants under a contract that ends December 31, 2027. Lake Huron water board agenda, Oct 1, 2026 (PDF) ↗

    OPTION7. Move water into a public corporation

  3. City pipes to your tap

    WHO DECIDESCity council (By-law W-8)

    The City owns the pipe to the property line. The private side, including any lead service, is the owner's. City of London, Water system ↗

    OPTIONS1. Steady full-cost rates, or smoothed increases, 3. Replace lead service pipes faster

  4. Your bill

    WHO DECIDESCity council sets the rates; London Hydro reads meters and bills

    The average home paid $1,333 in 2026 for water, sewer and stormwater. 2027 Water and Wastewater Rates report, SPPC Oct 6, 2026 (PDF) ↗

    OPTIONS1. Steady full-cost rates, or smoothed increases, 5. Charge stormwater by hard surface, 6. Ongoing bill help for low-income households

  5. Sanitary and storm sewers

    WHO DECIDESCity council (By-law WM-28)

    About 50,000 properties still send weeping tile water into the sanitary sewer, and 11.69 km of combined sewer remains. Pollution Prevention and Control Plan Update, final report, May 14, 2026 (PDF) ↗2025 Sewage Collection System Annual Performance Report (PDF) ↗

    OPTIONS4. Cut sewage overflows to the Thames faster, 5. Charge stormwater by hard surface

  6. Five City sewage plants

    WHO DECIDESCity council builds and runs them; the Province approves sewage works

    Greenway, Pottersburg and Oxford have named limits on growth, and the Hyde Park pumping station is full. Planning and Environment Committee agenda, Sept 29, 2026 (PDF) ↗Planning and Environment Committee agenda, June 22, 2026, p. 158 (PDF) ↗Wastewater and Treatment 2024-2027 Business Plan (PDF) ↗

    OPTIONS2. Build sewage capacity first, or pace approvals to it, 4. Cut sewage overflows to the Thames faster

  7. The Thames River

    WHO DECIDESThe Province sets overflow policy; Ottawa sets effluent rules

    In 2024 the plants and pumping stations released partly treated and raw flow in 55 events. City of London, Bypasses and Overflows Data 2024 (PDF) ↗

    OPTION4. Cut sewage overflows to the Thames faster

Over all of it, the Province licenses the system, requires a drinking water financial plan, and can designate a water corporation (option 7).

The honest numbers

Where London stands, every figure linked to its source.

Who runs London's water

Water and sewer run on their own rates, which council sets each fall. London buys its drinking water from two regional systems and holds a majority of the votes on the Lake Huron board. 2026 Annual Budget Update (PDF) ↗Lake Huron water board agenda, Oct 1, 2026 (PDF) ↗

READ THE NUMBERS (5 POINTS, WITH SOURCES)

What you pay, and why it's rising

The average home bill goes from $1,333 in 2026 to $1,399 in 2027, after one-time relief in 2025 and 2026 ran out. 2027 Water and Wastewater Rates report, SPPC Oct 6, 2026 (PDF) ↗

AVERAGE HOME WATER, SEWER AND STORMWATER BILL: TO SCALE
2023$1,216
2024$1,257
2025$1,303
2026$1,333
2027$1,399

200 m³ a year. The 2023 to 2025 totals are derived, our sums of the City's water, sanitary and stormwater rows. 2026 and 2027 are the City's own totals from the 2027 rates report. 2026 Annual Budget Update (PDF) ↗

BOTH TRUE AT ONCE
$1,057
for water and sewer on a typical London home in 2025, against a $1,491 average across the municipalities in the BMA comparison the City cites
9.7%
of wastewater rate revenue going to debt payments by 2033, up from 3.4% in 2024
READ THE NUMBERS (5 POINTS, WITH SOURCES)

Pipes, plants and room to grow

The pipes score well on the City's asset plan. Sewage treatment is the tighter limit, with constraints named at Greenway, Pottersburg, Oxford and the Hyde Park pumping station. 2023 Corporate Asset Management Plan (PDF) ↗Planning and Environment Committee agenda, Sept 29, 2026 (PDF) ↗Planning and Environment Committee agenda, June 22, 2026, p. 158 (PDF) ↗

READ THE NUMBERS (7 POINTS, WITH SOURCES)

What comes out of the tap

London's tap water met every health-based standard in 2025, and the Ministry's inspection found no non-compliance. 2025 Drinking Water Summary and Annual Report (PDF) ↗MECP 2025 inspection report, London distribution system (PDF) ↗

READ THE NUMBERS (3 POINTS, WITH SOURCES)

What goes into the Thames

In 2024 the City's plants and pumping stations had 55 bypass and overflow events, and the river through central London graded D on its last report card. City of London, Bypasses and Overflows Data 2024 (PDF) ↗Upper Thames River Conservation Authority, report card tables (PDF) ↗

WHAT THE PLANTS RELEASED IN 2024, BY TREATMENT LEVEL (M³): TO SCALE
Raw overflow62,398
Raw bypass37,244
Primary-treated224,643
Secondary-treated28,097

The City's four printed totals across 55 events at plants and pumping stations. Most of the volume was partly treated. City of London, Bypasses and Overflows Data 2024 (PDF) ↗

READ THE NUMBERS (5 POINTS, WITH SOURCES)

Council's record

Every water and sewer rate vote this term passed committee without a dissenting vote. The one split vote found was 2 to 4 against asking staff for a point-of-sale weeping tile plan. SPPC minutes, Oct 6, 2026 ↗Infrastructure and Corporate Services Committee minutes, Mar 23, 2026 ↗

READ THE NUMBERS (4 POINTS, WITH SOURCES)
  • Every water and wastewater rate decision this term passed committee without a dissenting vote. The 2027 rates passed the Strategic Priorities and Policy Committee 14 to 0 on October 6, 2026, with Councillor Ferreira absent and no members of the public speaking. No member moved a water or wastewater amendment in the 2024 multi-year budget or the 2026 update. SPPC minutes, Oct 6, 2026 ↗2026 Annual Budget Update (PDF) ↗
  • The one split vote found on water or sewers this term was on weeping tiles. On March 23, 2026 the Infrastructure and Corporate Services Committee voted on directing staff to report back with an implementation plan for a point-of-purchase weeping tile disconnection program, which would apply when qualifying older homes are sold. Councillors Franke and McAlister moved it and voted for it. Mayor Morgan and Councillors Peloza, Van Meerbergen and Stevenson voted against, and it failed 2 to 4. The committee then received the consultants' plan 6 to 0. On March 31 council approved the item without the report-back, 14 to 0 as part of the committee's report, and no member moved to restore it. Infrastructure and Corporate Services Committee minutes, Mar 23, 2026 ↗Council minutes, Mar 31, 2026 ↗
  • With one split vote in the record, this file has no vote grid. Most of the differences among council members will show up in the decisions ahead. SPPC minutes, Oct 6, 2026 ↗
  • Council's adoption of the 2027 rate by-laws (Bills 356 and 357) was on its October 14, 2026 agenda. Those minutes were not yet posted when this page was researched. 2027 Water and Wastewater Rates report, SPPC Oct 6, 2026 (PDF) ↗

The option space

What cities try for this. Evidence for, evidence against, costs, and who decides, for every option, identically. The site does not pick one. That's council's job, and yours to weigh in on.

OPTION 1 OF 7

Steady full-cost rates, or smoothed increases

Set rates each year to fund pipe renewal, growth and debt on schedule, or smooth the increases by drawing on reserves, borrowing or retiming projects. Over 2024 to 2027 London's increases averaged 2.7% for water and 4.3% for wastewater, with swings from year to year.

■ CITY DECIDES■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
WHAT IT COST ELSEWHERE
AT LONDON'S SCALE: ARITHMETIC SHOWN

At 2026 bills, each percentage point on water is about $5.70 a year for the average home and each point on wastewater (including stormwater) about $7.63 (derived from the City's average bill rows). 2026 Annual Budget Update (PDF) ↗

■ CITY DECIDESCouncil, through the annual W-8 and WM-28 rate by-laws and the multi-year budget. Under strong-mayor rules the Mayor tables the budget, and the rate by-laws are council votes.
OPTION 2 OF 7

Build sewage capacity first, or pace approvals to it

Build plant and pumping upgrades at Oxford, Pottersburg, Greenway and Hyde Park ahead of demand, or hold development approvals where capacity is short until the work is done. The council policy targeted for the second quarter of 2027 will set the rule.

□ SHARED: CITY + PROVINCE■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
WHAT IT COST ELSEWHERE
  • No comparable cost of building capacity ahead of growth was found for another Ontario city.
AT LONDON'S SCALE: ARITHMETIC SHOWN

$418 million of wastewater growth capital is in the 2024 to 2033 plan, and staff put the Pottersburg upgrade alone at about $400 million. 2026 Annual Budget Update (PDF) ↗Planning and Environment Committee agenda, Oct 1, 2025 (PDF) ↗

□ SHARED: CITY + PROVINCECouncil sets the capital budget, the capacity policy and development charges. The Province sets the development-charge exemptions and housing targets and funds some projects through the Building Faster Fund.
OPTION 3 OF 7

Replace lead service pipes faster

Add grants, targeted replacement or replacement on sale to London's loan-only help for the private side. Today the City replaces its side free when an owner replaces theirs, and lends owners of buildings with up to three units the private-side cost on the tax bill over 10 years.

■ CITY DECIDES■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
WHAT IT COST ELSEWHERE
AT LONDON'S SCALE: ARITHMETIC SHOWN

About 3,700 public-side lead services may remain (derived: 3% of the 124,644 water services in the City's 2023 asset plan, and the 3% is rounded). The City publishes no current count. Water Service Area Financial Plan, Oct 2024 (PDF) ↗2023 Corporate Asset Management Plan (PDF) ↗

■ CITY DECIDESCouncil sets the program design and pays for it through the water rate. Health Canada and the Province set the lead standards.
OPTION 4 OF 7

Cut sewage overflows to the Thames faster

Speed up combined sewer separation, require or pay for weeping tile disconnection, and set a public overflow target. About $57 million has gone to sewer separation projects since 2018.

□ SHARED: CITY + PROVINCE■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
WHAT IT COST ELSEWHERE
  • No comparable cost of sewer separation in another Ontario city was found.
AT LONDON'S SCALE: ARITHMETIC SHOWN

11.69 km of combined sewer remains. A flat-rate private drain renewal costs $7,250 in 2026, payable over 10 years on the tax bill. 2025 Sewage Collection System Annual Performance Report (PDF) ↗City of London, Sewers ↗

□ SHARED: CITY + PROVINCECouncil sets wastewater capital and would pass any disconnection by-law. The Province approves sewage works and sets the overflow policy.
OPTION 5 OF 7

Charge stormwater by hard surface

Replace London's flat stormwater fee ($20.74 a month for most lots of 0.4 hectares or less) with tiers based on roofs and paving, with credits for owners who manage runoff on site.

■ CITY DECIDES■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
WHAT IT COST ELSEWHERE
AT LONDON'S SCALE: ARITHMETIC SHOWN

Stormwater is 28% of wastewater revenue and $249 a year on the average home in 2026. A restructure would shift who pays the charge and need not raise the total. 2026 Annual Budget Update (PDF) ↗

■ CITY DECIDESCouncil, through By-law WM-28.
OPTION 6 OF 7

Ongoing bill help for low-income households

Add a standing rebate or reduced rate on top of today's $100,000-a-year crisis fund, which the $0.25 monthly customer-assistance charge pays for. The fund pauses until January 1 if it runs out.

■ CITY DECIDES□ COST NOT DERIVABLE
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
WHAT IT COST ELSEWHERE
  • Program costs for Toronto's and Peel's relief were not found.
AT LONDON'S SCALE: NOT DERIVABLE FROM PUBLIC DATA

London's current crisis fund is $100,000 a year. No estimate for an expanded program exists. City of London, Your water bill ↗

■ CITY DECIDESCouncil, through the W-8 rates and the use of the customer-assistance reserve.
OPTION 7 OF 7

Move water into a public corporation

Deliver water and wastewater through a separate public corporation under the 2025 Act, by choice or by provincial designation. London already shares its drinking water supply with neighbours through the two regional boards.

□ PROVINCE DECIDES■ COSTED
THE EVIDENCE, THE COSTS, WHO DECIDES▾
EVIDENCE FOR
EVIDENCE AGAINST / LIMITS
WHAT IT COST ELSEWHERE
  • No cost figure exists yet. The Peel corporation is not operating.
AT LONDON'S SCALE: ARITHMETIC SHOWN

The regional boards' legal advice is that the Act does not apply to London as written. London's outstanding wastewater debt is $87.0 million in 2026. Lake Huron water board agenda, Oct 1, 2026 (PDF) ↗2026 Annual Budget Update (PDF) ↗

□ PROVINCE DECIDESThe Province designates by regulation. Council decides any expression of interest and its advocacy position, and every member municipality has a say for the regional systems.

What the new council decides, and when

Events on the calendar, not outcomes. Dates the City hasn't set are marked as such.

  1. From November 15, 2026
    CITY COUNCIL

    The new council takes office and names London's members of both regional water boards for the term. Lake Huron water board agenda, Oct 1, 2026 (PDF) ↗

  2. End of 2026 (anticipated)
    ELGIN AREA WATER BOARD AND MEMBER MUNICIPALITIES

    A new Elgin Area water supply agreement that shifts more of London's southeast supply toward Lake Huron. Elgin Area water board agenda, Oct 1, 2026 (PDF) ↗

  3. 2027 budget update (date not yet set)
    CITY COUNCIL

    The budget update carries the wastewater right-sizing case behind the 5.1% increase. Staff say rates would be re-adjusted if the budget changes materially. 2027 Water and Wastewater Rates report, SPPC Oct 6, 2026 (PDF) ↗

    OPTION1. Steady full-cost rates, or smoothed increases

  4. Second quarter of 2027
    CITY COUNCIL

    A council policy on wastewater servicing capacity, with the Oxford upgrade money moved up to 2027. Planning and Environment Committee agenda, June 22, 2026, p. 158 (PDF) ↗

    OPTION2. Build sewage capacity first, or pace approvals to it

  5. By December 31, 2027
    REGIONAL WATER BOARDS

    The operating contract for the regional water plants ends and must be renewed or replaced. Lake Huron water board agenda, Oct 1, 2026 (PDF) ↗

  6. January 1, 2028 (target)
    CITY COUNCIL

    The 2028 development charge by-law, which sets what new homes pay toward water and sewer growth, is targeted to take effect. Get Involved London, 2028 development charges study ↗

    OPTION2. Build sewage capacity first, or pace approvals to it

What to ask your council

Anyone at City Hall can say this issue matters. These are the questions that ask for specifics. Send them to your councillor, or bring them to a committee meeting.

  1. Water and sewer bills rise about 5% in 2027 after a smaller increase in 2026. For the next four-year budget, would you raise rates steadily to keep pace with repairs and growth, or hold them down and delay projects, and which projects would you delay?
  2. The Oxford sewage plant is expected to run tight within two to three years. When a plant is near capacity, should new homes wait, should growth pay more through development charges, or should all ratepayers pay to expand sooner?
  3. London helps with lead pipes through a loan, not a grant. Would you keep that, add grants, or require replacement when a home is sold, and who should pay?
  4. About 50,000 homes still send weeping tile water into the sewer, which feeds overflows to the Thames. Should the City require disconnection, pay more of the cost, or keep it voluntary?
  5. Most properties under 0.4 hectares pay the same stormwater charge whatever their roof and paving. Should the charge depend on how much hard surface a property has, with credits for owners who manage their own runoff?
  6. If the Province offered or required a separate water corporation for London, what would you need to see on ownership, rates and accountability before supporting it?
CLAIMS THAT COULDN’T BE VERIFIED, SO THEY’RE NOT ON THIS PAGE ▾

These circulate in coverage of this issue but could not be traced to a source that loads and says what’s claimed. The site would rather show you the gap than publish the number.

  • Rated capacity and current flow at each of London's five sewage plants. The City publishes no plant-by-plant table.
  • A current count of lead services, public or private, and the yearly replacement pace.
  • 2025 plant bypass and overflow totals (the City's page lists data only to 2024) and any reliable 2023 total.
  • PFAS results for London or either regional plant.
  • The Ministry's numeric inspection rating for London and the regional systems.
  • London's share of the phosphorus reaching the Thames.
  • London's vote share on the Elgin Area board.
  • Comparable costs elsewhere for building sewage capacity ahead of growth and for sewer separation.